Difference between revisions of "GTS meeting 11 08 16"
Jump to navigation
Jump to search
Line 12: | Line 12: | ||
* EES support at GTS: | * EES support at GTS: | ||
# SCAM module installation | # SCAM module installation | ||
− | # Upgrade diagnostic crossings with 3-position controls (viewer, slit, empty) | + | # Upgrade the two diagnostic crossings with 3-position controls (viewer, slit, empty) |
# Instrument Faraday Cup | # Instrument Faraday Cup | ||
Latest revision as of 16:08, 15 November 2016
- Beamline Drawings:
- New Beamline Magnets:
- Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total)
- EES support at GTS:
- SCAM module installation
- Upgrade the two diagnostic crossings with 3-position controls (viewer, slit, empty)
- Instrument Faraday Cup
- Procurement:
- Two radiabeam steerers
- Steerers mounts
- What else?