Difference between revisions of "April 21, 2017 - 200kV gun upgrade meeting"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
: [[media:M20_flange_options.pdf]] [[media:M20_BPM.pdf]] | : [[media:M20_flange_options.pdf]] [[media:M20_BPM.pdf]] | ||
:: [[File:IMG_5188-1.JPG|100px]][[File:IMG_5189-1.JPG|100px]] | :: [[File:IMG_5188-1.JPG|100px]][[File:IMG_5189-1.JPG|100px]] | ||
+ | |||
+ | * Dependence of signal on geometry (1/r^2) results in 45% loss of M20 relative to M15 | ||
+ | : M15 radius = 1.75cm | ||
+ | : M20 radius = 2.35cm | ||
===Gun3 Removal=== | ===Gun3 Removal=== |
Revision as of 15:27, 20 April 2017
200kV Gun
- Timeline/sequence update for 200kV HV chamber media:170421_CHG.pdf
- Opera/Tosca 3D Model
Gun2 NEG Tube
- Danny updated NEG tube media:NEGTUBE_MARCH31.pdf
- Dependence of signal on geometry (1/r^2) results in 45% loss of M20 relative to M15
- M15 radius = 1.75cm
- M20 radius = 2.35cm
Gun3 Removal
- Week May 8 to remove/replace Gun3 ATLIS task
Eliminating Gun Switch Software
- Friday, April 27th Gun switch removal and testing ATLIS task