(Created page with "* High current runs * Shutdown Plan: ## Install new YAG screen at viewer 3 ## Fix existing harp and install 20 µm tungsten wire ## Add a new CEBAF-style harp with 10 µm t...") |
|||
Line 4: | Line 4: | ||
* Shutdown Plan: | * Shutdown Plan: | ||
− | + | # Install new YAG screen at viewer 3 | |
− | + | # Fix existing harp and install 20 µm tungsten wire | |
− | + | # Add a new CEBAF-style harp with 10 µm tungsten wire (''i.e'', GTS will have two harps) | |
− | + | # Replace leaky vent valve | |
− | + | # Replace bad ion pump | |
* Next Shutdown – December 2017: | * Next Shutdown – December 2017: | ||
− | + | # Install TE011 cavity |
Revision as of 07:01, 11 September 2017
- High current runs
- Shutdown Plan:
- Install new YAG screen at viewer 3
- Fix existing harp and install 20 µm tungsten wire
- Add a new CEBAF-style harp with 10 µm tungsten wire (i.e, GTS will have two harps)
- Replace leaky vent valve
- Replace bad ion pump
- Next Shutdown – December 2017:
- Install TE011 cavity