(Created page with "* High current runs * Shutdown Plan: # Install new YAG screen at viewer 3 # Fix existing harp and install 20 µm tungsten wire # Add a new CEBAF-style harp with 10 µm tung...") |
|||
Line 1: | Line 1: | ||
− | |||
− | |||
− | |||
* Shutdown Plan: | * Shutdown Plan: | ||
Line 14: | Line 11: | ||
* Next Shutdown – January 2018: | * Next Shutdown – January 2018: | ||
# Install TE011 cavity | # Install TE011 cavity | ||
+ | |||
+ | |||
+ | * High current runs |
Revision as of 07:35, 16 October 2017
- Shutdown Plan:
- Install new YAG screen at viewer 3
- Fix existing harp and install 20 µm tungsten wire
- Add a new CEBAF-style harp with 10 µm tungsten wire (i.e, GTS will have two harps)
- Replace leaky vent valve
- Replace bad ion pump
- Activate new photocathode (new puck) with full active area
- Next Shutdown – January 2018:
- Install TE011 cavity
- High current runs