Difference between revisions of "GTS meeting 1 07 19"

From Ciswikidb
Jump to navigation Jump to search
Line 9: Line 9:
 
# Install TE011 Cavity
 
# Install TE011 Cavity
 
# Install Deflecting Cavity
 
# Install Deflecting Cavity
# Install 4th solenoid
+
# Install new 4th solenoid
 
# Move DP can 1 to end of beamline
 
# Move DP can 1 to end of beamline
 
# All bellows at least 2.5 inch diameter
 
# All bellows at least 2.5 inch diameter

Revision as of 10:02, 3 January 2019

  • List of modifications:
  1. Replace YAG screen on Viewer 1
  2. Replace Slit on Viewer 2 with holes assembly
  3. Replace two ion collectors with new ones
  4. Replace Harp fork (Tony)
  5. Remove modified DP can
  6. Remove Faraday Cup
  7. Remove bellow upstream of dump
  8. Install TE011 Cavity
  9. Install Deflecting Cavity
  10. Install new 4th solenoid
  11. Move DP can 1 to end of beamline
  12. All bellows at least 2.5 inch diameter