Difference between revisions of "GTS meeting 1 07 19"

From Ciswikidb
Jump to navigation Jump to search
Line 13: Line 13:
 
# All bellows at least 2.5 inch diameter
 
# All bellows at least 2.5 inch diameter
 
# Both gate valves are 2.5 inch-bore and will remain on beamline
 
# Both gate valves are 2.5 inch-bore and will remain on beamline
 +
# Remove LDR Harp arm and replace with ion-pump
  
  
Line 28: Line 29:
 
# Fix Transverse Manipulator
 
# Fix Transverse Manipulator
 
# Fix Sb boat
 
# Fix Sb boat
# Clean chamber of Sb balls
+
# Clean chamber of Sb beads

Revision as of 10:49, 14 January 2019

  • List of beamline hardware modifications:
  1. Replace YAG screen on Viewer 1
  2. Replace Slit on Viewer 2 with holes assembly
  3. Replace two ion collectors with new ones
  4. Replace Harp fork (Tony)
  5. Remove modified DP can
  6. Remove Faraday Cup
  7. Remove bellow upstream of dump
  8. Install TE011 Cavity
  9. Install Deflecting Cavity
  10. Install new 5th solenoid
  11. Move DP can 1 to end of beamline
  12. All bellows at least 2.5 inch diameter
  13. Both gate valves are 2.5 inch-bore and will remain on beamline
  14. Remove LDR Harp arm and replace with ion-pump


  • Remove gain-switched laser from GTS to LERF


  • List of software and controls changes:
  1. Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
  2. Add 5th solenoid to magnet screen


  • Modification to HV and Preparation chambers:
  1. Upgrade anode HV bias feed-through to 5 kV
  2. Remove anode and clean melted spot
  3. Fix Transverse Manipulator
  4. Fix Sb boat
  5. Clean chamber of Sb beads