Difference between revisions of "GTS meeting 1 14 19"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
= '''List of beamline hardware modifications:''' =
+
= '''List of beamline hardware modifications''' =
 
# Replace YAG screen on Viewer 1 - '''''Done'''''
 
# Replace YAG screen on Viewer 1 - '''''Done'''''
 
# Replace Slit on Viewer 2 with holes assembly - '''''Done'''''
 
# Replace Slit on Viewer 2 with holes assembly - '''''Done'''''
Line 16: Line 16:
  
  
= '''List of hardware support:''' =
+
= '''List of hardware support''' =
 
# Install Deflecting Cavity power supply, MO and other parts
 
# Install Deflecting Cavity power supply, MO and other parts
 
# Install TE011 Cavity readout cable and electronics
 
# Install TE011 Cavity readout cable and electronics
  
  
= ''' List of software and controls changes:''' =
+
= ''' List of software and controls changes''' =
 
# Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
 
# Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
 
# Add 5th solenoid to magnet screen
 
# Add 5th solenoid to magnet screen
  
  
= ''' Modification to HV and Preparation chambers:''' =
+
= ''' Modification to HV and Preparation chambers''' =
 
# Upgrade anode HV bias feed-through to 5 kV
 
# Upgrade anode HV bias feed-through to 5 kV
 
# Remove anode and clean melted spot
 
# Remove anode and clean melted spot

Revision as of 09:44, 15 January 2019

List of beamline hardware modifications

  1. Replace YAG screen on Viewer 1 - Done
  2. Replace Slit on Viewer 2 with holes assembly - Done
  3. Replace two ion collectors with new ones
  4. Replace Harp fork (Tony)
  5. Remove modified DP can - Done
  6. Remove Faraday Cup - Done
  7. Remove bellow upstream of dump - Done
  8. Remove LDR Harp arm and replace with ion-pump
  9. Install TE011 Cavity
  10. Install Deflecting Cavity
  11. Install new 5th solenoid
  12. Move DP can 1 to end of beamline
  13. All bellows at least 2.5 inch diameter
  14. Both gate valves are 2.5 inch-bore and will remain on beamline - Done


List of hardware support

  1. Install Deflecting Cavity power supply, MO and other parts
  2. Install TE011 Cavity readout cable and electronics


List of software and controls changes

  1. Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
  2. Add 5th solenoid to magnet screen


Modification to HV and Preparation chambers

  1. Upgrade anode HV bias feed-through to 5 kV
  2. Remove anode and clean melted spot
  3. Fix Transverse Manipulator
  4. Fix Sb boat
  5. Clean chamber of Sb pellets


Remove gain-switched laser from GTS to LERF

Install BNL high bunch laser

Install Brock's TE011 Cavity