Difference between revisions of "GTS meeting 2 04 19"

From Ciswikidb
Jump to navigation Jump to search
 
Line 15: Line 15:
 
# All bellows at least 2.5 inch diameter - '''''Done'''''
 
# All bellows at least 2.5 inch diameter - '''''Done'''''
 
# Both gate valves are 2.5 inch-bore and will remain on beamline - '''''Done'''''
 
# Both gate valves are 2.5 inch-bore and will remain on beamline - '''''Done'''''
# S&A on Friday February 8, 2019
+
# S&A on Thursday February 7, 2019
  
 
= '''List of hardware support''' =
 
= '''List of hardware support''' =

Latest revision as of 12:28, 6 February 2019

List of beamline hardware modifications

  1. Replace YAG screen on Viewer 1 - Done
  2. Replace Slit on Viewer 2 with holes assembly - Done
  3. Replace two ion collectors with new ones - Done
  4. Replace Harp fork (Tony)
  5. Remove modified DP can - Done
  6. Remove Faraday Cup - Done
  7. Remove bellow upstream of dump - Done
  8. Remove LDR Harp arm and replace with ion-pump
  9. Rotate Viewer 3 to vertical - Done
  10. Install TE011 Cavity
  11. Install Deflecting Cavity - Done
  12. Install new 5th solenoid
  13. Move DP can 1 to end of beamline - Done
  14. All bellows at least 2.5 inch diameter - Done
  15. Both gate valves are 2.5 inch-bore and will remain on beamline - Done
  16. S&A on Thursday February 7, 2019

List of hardware support

  1. Install Deflecting Cavity power supply, MO and other parts
  2. Install TE011 Cavity readout cable and electronics


List of software and controls changes

  1. Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
  2. Add 5th solenoid to magnet screen


Remove gain-switched laser (seed and pre-amp) from GTS to LERF

Install Brock's Magnetometer Cavity

Modification to HV and Preparation chambers

  1. Upgrade anode HV bias feed-through to 5 kV
  2. Remove anode and clean melted spot
  3. Fix Transverse Manipulator
  4. Fix Sb boat
  5. Clean Sb pellets off chamber


Install BNL high bunch laser