Difference between revisions of "GTS meeting 3 11 19"
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
# Commission TE011 cavity | # Commission TE011 cavity | ||
# Radiation Surveys at 1 mA | # Radiation Surveys at 1 mA | ||
− | # Measure Drift Emittance at | + | # Measure Drift Emittance at 200 and 300 kV and laser rms = 0.9 mm |
# Ghost beam studies with P-Gun - List of experiments [[Ghost Beam Studies | here]] | # Ghost beam studies with P-Gun - List of experiments [[Ghost Beam Studies | here]] |
Latest revision as of 11:17, 11 March 2019
- Laser frequency is at 499.20025 MHz
- Shorted out HV power supply conditioning resistor
- Re-tuned DQWR cavity by rotating power-in coupler (broke vacuum)
- List of things to do:
- RadCon Group to check for x-rays from DQWR cavity
- Calibrate new DQWR RF power supply up to 500 W
- Measure bunch length using new RF supply
- Commission TE011 cavity
- Radiation Surveys at 1 mA
- Measure Drift Emittance at 200 and 300 kV and laser rms = 0.9 mm
- Ghost beam studies with P-Gun - List of experiments here