Line 1: | Line 1: | ||
− | + | == (1) Get GTS back to operational == | |
+ | |||
+ | To Fix List (to get GTS running): | ||
+ | |||
+ | * Glassman PSS Chassis (Service request to Omar - Carlos) | ||
+ | * LCW Chassis (Sarin/ Mike Todd - follow up) | ||
+ | * Turbo (Replacement part for display - Bubba/Fay) | ||
+ | * Spellman (Augistine/ Riad) | ||
+ | * Picoammeter x2? (Pete Francis in hand - sent for fix) | ||
+ | |||
+ | To Check: | ||
+ | * Viewers (Operation - and cameras) (Viewer software - contact Brian Freeman)(??IOC reset?? Tony Delacruz) | ||
+ | * Magnets (IOC check) | ||
+ | * Harp (electronics) | ||
+ | * Cavities (electronics) | ||
+ | * Cathode solenoid - power supply | ||
+ | |||
+ | == (2) T-Gun Upgrades == | ||
+ | |||
+ | Need a safe gun - no devastating trips. | ||
+ | '''Limit voltage to 135kV''' | ||
+ | |||
+ | RF cage - Features: | ||
+ | * HV attaches through the back as designed. | ||
+ | * G10 plate to support the HV cable | ||
+ | * Nitrogen flow, also through G10 plate aimed at the back of the hot deck | ||
+ | * Nitrogen flow, though the top of the cage, aimed at ceramic | ||
+ | * Dimensions need to be longer than the table to keep E fields on the hot deck lower than 3MV/m (air breakdown) | ||
+ | |||
+ | To Fix/Modify: | ||
+ | * DC bias supply - set point fix (John Musson) | ||
+ | * RF Cage (Mark/Fay) | ||
+ | * Back plate to allow increased cooling (open the hole) | ||
+ | * Move Xelera spellman to the GTS vault | ||
+ | * Software issues (contact Spellman again) | ||
+ | * Install new fiber link & check | ||
+ | |||
+ | == (3) == | ||
+ | Housekeeping: | ||
+ | * Remove RXX cables from GTS | ||
+ | * Remove JLab spellman | ||
+ | * Sort out the air and nitrogen lines. | ||
+ | * Buy a shop vac (ask Bubba) |
Latest revision as of 07:26, 23 September 2019
(1) Get GTS back to operational
To Fix List (to get GTS running):
- Glassman PSS Chassis (Service request to Omar - Carlos)
- LCW Chassis (Sarin/ Mike Todd - follow up)
- Turbo (Replacement part for display - Bubba/Fay)
- Spellman (Augistine/ Riad)
- Picoammeter x2? (Pete Francis in hand - sent for fix)
To Check:
- Viewers (Operation - and cameras) (Viewer software - contact Brian Freeman)(??IOC reset?? Tony Delacruz)
- Magnets (IOC check)
- Harp (electronics)
- Cavities (electronics)
- Cathode solenoid - power supply
(2) T-Gun Upgrades
Need a safe gun - no devastating trips. Limit voltage to 135kV
RF cage - Features:
- HV attaches through the back as designed.
- G10 plate to support the HV cable
- Nitrogen flow, also through G10 plate aimed at the back of the hot deck
- Nitrogen flow, though the top of the cage, aimed at ceramic
- Dimensions need to be longer than the table to keep E fields on the hot deck lower than 3MV/m (air breakdown)
To Fix/Modify:
- DC bias supply - set point fix (John Musson)
- RF Cage (Mark/Fay)
- Back plate to allow increased cooling (open the hole)
- Move Xelera spellman to the GTS vault
- Software issues (contact Spellman again)
- Install new fiber link & check
(3)
Housekeeping:
- Remove RXX cables from GTS
- Remove JLab spellman
- Sort out the air and nitrogen lines.
- Buy a shop vac (ask Bubba)