(Created page with "'''Limit voltage to 135kV''' == (1) Status == * Gun assembled with ceramic and blank flange only. Pumping. 4e-8 over 3 days (potential leak) * RF cage complete * Back plate...")
 
(Replaced content with "* Vacuum leak * PSS trip at 115 kV")
Line 1: Line 1:
'''Limit voltage to 135kV'''
+
* Vacuum leak
  
== (1) Status ==
+
* PSS trip at 115 kV
 
 
* Gun assembled with ceramic and blank flange only. Pumping. 4e-8 over 3 days (potential leak)
 
* RF cage complete
 
* Back plate modified and hot deck attached in 'run set-up' (new bar placement an issue - might want to recess the bar)
 
* Electrode assembled and snow cleaned ready for installation
 
* GTS cleaner
 
 
 
== (2) Plans ==
 
* PSS cert
 
* Run up Xelera spellman connected to gun to 135kV
 
* If corona test good... break vacuum and install electrodes
 
* Leak check, Quick HV test, then bake, Kr processing as necessary
 
 
 
To Fix List (to get GTS running):
 
 
 
* Glassman PSS Chassis (Service request to Omar - Carlos)
 
* LCW Chassis (Coleman today or tomorrow)
 
* Spellman (needs further investigation)
 
* Picoammeter x2? (Pete Francis in hand - sent for fix)
 
* Viewers insertion boxes bad
 
 
 
To Check:
 
 
 
* Magnets (IOC check)
 
* Cathode solenoid - power supply
 
 
 
== (3) T-Gun Upgrades ==
 
 
 
To Fix/Modify:
 
* DC bias supply - set point fix (John Musson)
 
* Software issues (Karl to contact Spellman again)
 
* Install new fiber link & check (CW setting - Mark emailed company)
 
* Need RF fiber from Karl for reflected power
 
 
 
== (4) Housekeeping==
 
 
 
* Remove JLab spellman
 
* Sort out the air and nitrogen lines.
 

Revision as of 11:53, 14 October 2019

  • Vacuum leak
  • PSS trip at 115 kV