Difference between revisions of "AIPINJ Layouts"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
== Existing April 2020 Injector Layout ==
+
==Overall Phase 1 & 2 AIPINJ Layouts==
* Existing April 2020 injector quick reference (thanks, Daniel!) : [[media:12GeV_injector_quick_reference_rev16.pdf]]
 
 
 
==Overall Layouts==
 
 
Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster).  The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
 
Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster).  The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
 
* July 19, 2019 [[media:keytotaljuly19.pdf]]
 
* July 19, 2019 [[media:keytotaljuly19.pdf]]
 
* July 17, 2019 [[media:keytotaljuly17.pdf]]
 
* July 17, 2019 [[media:keytotaljuly17.pdf]]
  
==Gun Layouts==
+
==Phase 1 - Photogun Layouts==
 
* Aug 21, 2020 [[media:SONGSHEET AUGUST 21 dm comments.pdf]] Draft/preliminary songsheet
 
* Aug 21, 2020 [[media:SONGSHEET AUGUST 21 dm comments.pdf]] Draft/preliminary songsheet
 
* Apr 15, 2020 [[media:beamlinelayoutapril15.pdf]] attached is the latest layout for the beamline components
 
* Apr 15, 2020 [[media:beamlinelayoutapril15.pdf]] attached is the latest layout for the beamline components
Line 28: Line 25:
 
* Jun 13, 2019 [[media:190613_guntochopper.pdf]]
 
* Jun 13, 2019 [[media:190613_guntochopper.pdf]]
  
==Chopper Layouts==
+
==Phase 2 - Booster Layouts==
* chopper assembly [[media:190606_chopper_assembly_drawing.pdf]]
 
 
 
==Booster Layouts==
 
 
Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster).  The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
 
Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster).  The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
 
* Sep 26, 2019 [[media:190926_boosterregion.pdf]]
 
* Sep 26, 2019 [[media:190926_boosterregion.pdf]]
Line 41: Line 35:
 
* June 10, 2019 [[media:190610_layoutjune10.pdf]]
 
* June 10, 2019 [[media:190610_layoutjune10.pdf]]
  
==Warm-RF Drawings==
+
== Injector quick reference drawing ==
* prebuncher cavity [[media:190613_prebuncher.pdf]]
+
* Existing April 2020 injector quick reference (thanks, Daniel!) : [[media:12GeV_injector_quick_reference_rev16.pdf]]
* buncher cavity [[media:190815_CEBAF_BUNCHER.pdf]]
 
* chopper RF cavity [[media:Haimson_chopper_cavities.pdf]]
 
  
 
==SRF Drawings==
 
==SRF Drawings==
 
* drawing from Jim Henry [[media:CRM1107001-0001_-_PDF_1.pdf]]
 
* drawing from Jim Henry [[media:CRM1107001-0001_-_PDF_1.pdf]]

Revision as of 13:44, 27 August 2020

Overall Phase 1 & 2 AIPINJ Layouts

Note: At the November 12, 2019 Modeling meeting [1], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.

Phase 1 - Photogun Layouts

-sequence just before the gun valve goes like this if possible: bellows + bpm/corr + valve.
-remove the pink rectangular placeholders for quadrupoles
-sequence after Vertical Wien: viewer/cross + bpm/corr + bellows, then pipe that solenoids are attached
-restore gap between the FG solenoids as exists in tunnel today
-sequence after Horizonal Wien: viewer/cross + prebuncher + bpm/corr, then bellows
-if moving valve/DP can upstream a little helps w/layout that's OK, keep subsequent solenoid located as shown

Phase 2 - Booster Layouts

Note: At the November 12, 2019 Modeling meeting [2], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.

-QCM was .32" further downstream. so all those interfaces moved.
-distance between chopper cavities was 59.32", so distance from center of choppers to downstream face of chopper #2 increased from 29.65" to 29.66".
-buncher, IFY0I06, MB00I06, A3, YAO cavity, A4 all moved slightly downstream.
-YAO cavity was .37" longer than the design drawing.

Injector quick reference drawing