Difference between revisions of "PPB - Nov 18, 2020"
Jump to navigation
Jump to search
Line 20: | Line 20: | ||
;Sami | ;Sami | ||
* Polarization transfer under pair creation process [[media:Polarization_transfer_pair_creation.pptx]] | * Polarization transfer under pair creation process [[media:Polarization_transfer_pair_creation.pptx]] | ||
+ | * Internship report [[media:M2_internship_report_Sami_HABET]] | ||
==Older note meeting== | ==Older note meeting== |
Revision as of 13:13, 20 November 2020
Meeting Info
We will meet on Wed (Mexico 10am, US 12pm, France 5pm) Bluejeans: https://bluejeans.com/164307983
Updates
- Joe
- Status of post-doc => approved, waiting on HR
- Possible CASA support topics => no feedback from Todd
- Evaluating magnet/collection topics of mutual interest w/ ILC PreLab
- polarized e- source (prototype gun/laser)
- e-driven scheme electron source (eng. design)
- e-driven scheme magnetic focusing system (prototype - FC/Sol, PS, transmission line)
- e-driven capture cavity (model/sim/eng. design)
- e-driven booster linac (eng. design)
- Cristhian
- Magnetic mirror condition media:201118_espt.pptx
- Sami
- Polarization transfer under pair creation process media:Polarization_transfer_pair_creation.pptx
- Internship report media:M2_internship_report_Sami_HABET
Older note meeting
- Americas Workshop on Linear Colliders (Oct 19-22)
- Jefferson Lab Accelerator Advisory Committee (Oct 20-23)
- APS Division of Nuclear Physics (Oct 29-31)