Difference between revisions of "AIPINJ - Layouts"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
+ | ==Phase 1 - Songsheet == | ||
+ | * Feb 1, 2021 - Preliminary songsheet release [[media:210201_PRELIMINARY_ACC0002845-0001, INJECTOR, REV C .pdf]] | ||
+ | |||
==Phase 1 - CED Layout Info == | ==Phase 1 - CED Layout Info == | ||
* Jan 27, 2021 - [[media:210127_AIPINJ_CED_v2.xlsx]] Row "D" shows edit for songsheet | * Jan 27, 2021 - [[media:210127_AIPINJ_CED_v2.xlsx]] Row "D" shows edit for songsheet |
Revision as of 09:57, 1 February 2021
Phase 1 - Songsheet
- Feb 1, 2021 - Preliminary songsheet release media:210201_PRELIMINARY_ACC0002845-0001, INJECTOR, REV C .pdf
Phase 1 - CED Layout Info
- Jan 27, 2021 - media:210127_AIPINJ_CED_v2.xlsx Row "D" shows edit for songsheet
- Sep 14, 2020 - media:200914_AIPINJ_CED.xlsx Final, updated CED list (checked DM/JG/AH/MS)
- Sep 10, 2020 - Rev 7 media:200910_AIPINJ_layout_rev7.xlsx returns VCG1I02
- Aug 31, 2020 - Rev 6 media:200831_AIPINJ_layout_rev6.xlsx Preliminary list and component comparison
Phase 1 - Gun to Chopper Layouts
- Sep 14, 2020 media:beamlinelayoutsep10.pdf Final, updated layout (checked DM/JG/AH/MS)
- Aug 27, 2020 media:beamlinelayoutaug27.pdf Preliminary Phase 1 layout
- Aug 21, 2020 media:SONGSHEET AUGUST 21 dm comments.pdf Draft/preliminary songsheet
- Apr 15, 2020 media:beamlinelayoutapril15.pdf attached is the latest layout for the beamline components
- Apr 07, 2020 media:beamlinelayoutapril7.pdf puzzling A1/A2 layout, moving FX 2" upstream
- Mar 26, 2020 media:beamlinelayoutmarch26.pdf
- Mar 09, 2020 media:BEAMLINELAYOUTMAR09.pdf 90% complete layout; note bellows on A1/A2 girder
- Feb 26, 2020 media:BEAMLINELAYOUTFEB26.pdf edits post ME meeting, small corrections
- -sequence just before the gun valve goes like this if possible: bellows + bpm/corr + valve.
- -remove the pink rectangular placeholders for quadrupoles
- -sequence after Vertical Wien: viewer/cross + bpm/corr + bellows, then pipe that solenoids are attached
- -restore gap between the FG solenoids as exists in tunnel today
- -sequence after Horizonal Wien: viewer/cross + prebuncher + bpm/corr, then bellows
- -if moving valve/DP can upstream a little helps w/layout that's OK, keep subsequent solenoid located as shown
- Feb 07, 2020 media:beamlinelayoutfeb07.pdf edits post ME meeting, small corrections
- Feb 04, 2020 media:BEAMLINELAYOUTFEB04.pdf edits post modellers meeting (add bpm/cor after Y, and swap bpm/corr by A1
- Jan 31, 2020 media:200203_layout.pdf major revision, for functionality to setup the beam line
- Jan 22, 2020 media:layout01232020.pdf move 2nd lens to accomodate 2-3/4" or 4-1/2" window
- Jan 15, 2020 media:200115_gun2chopper.pdf restore MFA0I03 and MFA0I05 to beam line
- Jul 17, 2019 media:gunthroughchopperjuly17.pdf
- Jun 13, 2019 media:190613_guntochopper.pdf
Phase 2 - Booster Layouts
Note: At the November 12, 2019 Modeling meeting [1], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
- Sep 26, 2019 media:190926_boosterregion.pdf
- -QCM was .32" further downstream. so all those interfaces moved.
- -distance between chopper cavities was 59.32", so distance from center of choppers to downstream face of chopper #2 increased from 29.65" to 29.66".
- -buncher, IFY0I06, MB00I06, A3, YAO cavity, A4 all moved slightly downstream.
- -YAO cavity was .37" longer than the design drawing.
- July 17, 2019 media:chopperthroughmodulejuly17.pdf
- June 10, 2019 media:190610_layoutjune10.pdf
Overall Phase 1 & 2 AIPINJ Layouts
Note: At the November 12, 2019 Modeling meeting [2], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
- July 19, 2019 media:keytotaljuly19.pdf
- July 17, 2019 media:keytotaljuly17.pdf
Injector quick reference drawing
- Existing April 2020 injector quick reference (thanks, Daniel!) : media:12GeV_injector_quick_reference_rev16.pdf