− | * | + | * Upgrade Glassman Gun PSS interlock chassis (Carlos) |
− | * Beamline - no bake of beamline: | + | * Beamline - no bake of beamline: (Mamun and Bubba) |
− | ** Replace YAG screens on Viewers 1 and | + | ** Replace YAG screens on Viewers 1,2 and 3 |
** Replace leaky right-angle valve | ** Replace leaky right-angle valve | ||
+ | ** Remove Deflecting Cavity and move TE_011 Cavity in its place (?) | ||
− | * Prep Chamber: | + | * Prep Chamber: (Mamun) |
** Fix Transverse Manipulator | ** Fix Transverse Manipulator | ||
** Fix Sb boat | ** Fix Sb boat | ||
Line 13: | Line 14: | ||
− | * Gun HV Chamber: | + | * Gun HV Chamber: (Carlos) |
+ | ** Clean anode, cathode front | ||
** Replace Anode | ** Replace Anode | ||
** Replace Pierce geometry | ** Replace Pierce geometry | ||
Line 19: | Line 21: | ||
− | * Laser: | + | * Laser: (Shukui) |
** Re-install 500 MHz green fiber laser | ** Re-install 500 MHz green fiber laser | ||
** Install new pulse laser | ** Install new pulse laser |
Revision as of 10:38, 1 February 2021
- Upgrade Glassman Gun PSS interlock chassis (Carlos)
- Beamline - no bake of beamline: (Mamun and Bubba)
- Replace YAG screens on Viewers 1,2 and 3
- Replace leaky right-angle valve
- Remove Deflecting Cavity and move TE_011 Cavity in its place (?)
- Prep Chamber: (Mamun)
- Fix Transverse Manipulator
- Fix Sb boat
- Clean Sb pellets off chamber
- Gun HV Chamber: (Carlos)
- Clean anode, cathode front
- Replace Anode
- Replace Pierce geometry
- Upgrade anode HV bias feed-through to 5 kV
- Laser: (Shukui)
- Re-install 500 MHz green fiber laser
- Install new pulse laser