Difference between revisions of "GTS meeting 2 02 21"
Jump to navigation
Jump to search
Line 12: | Line 12: | ||
** Fix Sb boat | ** Fix Sb boat | ||
** Clean Sb pellets off chamber | ** Clean Sb pellets off chamber | ||
+ | ** Clean/check Bottom Heater | ||
+ | ** Ad Cs for Robust Photocathode research | ||
+ | ** Clean/replace windows | ||
+ | ** Add pucks with Nb and GaAs (Robust Photocathode) substrates | ||
Revision as of 11:01, 15 February 2021
- Upgrade Glassman Gun PSS interlock chassis (Carlos)
- Beamline - no bake of beamline: (Mamun and Bubba)
- Replace YAG screens on Viewers 1,2 and 3
- Replace leaky right-angle valve
- Remove Deflecting Cavity and move TE_011 Cavity in its place
- Prep Chamber: (Mamun)
- Fix Transverse Manipulator
- Fix Sb boat
- Clean Sb pellets off chamber
- Clean/check Bottom Heater
- Ad Cs for Robust Photocathode research
- Clean/replace windows
- Add pucks with Nb and GaAs (Robust Photocathode) substrates
- Gun HV Chamber: (Carlos)
- Clean anode, cathode front
- Replace Anode
- Replace Pierce geometry
- Upgrade anode HV bias feed-through to 5 kV
- Laser: (Shukui)
- Re-install 500 MHz green fiber laser
- Install new pulse laser