Difference between revisions of "Meeting 2/3/22 - COMTRA"
Jump to navigation
Jump to search
(Created page with "==Agenda== ==First installation== ** remove ~4' pipe in straight passthrough ** add reducer + ceramic break + bubble radiator ** add MIT bates magnet + Mott detector on the s...") |
|||
Line 1: | Line 1: | ||
− | == | + | ==ME - First installation== |
+ | * remove ~4' pipe in straight passthrough | ||
+ | * add reducer + ceramic break + bubble radiator | ||
+ | * add MIT bates magnet + Mott detector on the support table | ||
+ | * realistic time frame for DAQ | ||
− | == | + | ==ME - Second installation== |
− | * | + | * Replace MIT magnet with Lakshmi's magnet |
− | + | * Replace Mott detector with Eric's detector | |
− | * | ||
− | |||
− | == | + | ==Updates & Discussion== |
− | |||
− |
Revision as of 15:07, 2 February 2022
ME - First installation
- remove ~4' pipe in straight passthrough
- add reducer + ceramic break + bubble radiator
- add MIT bates magnet + Mott detector on the support table
- realistic time frame for DAQ
ME - Second installation
- Replace MIT magnet with Lakshmi's magnet
- Replace Mott detector with Eric's detector