==ME - First installation==
+
*First installation
* remove ~4' pipe in straight passthrough
+
** remove ~4' pipe in straight passthrough
* add reducer + ceramic break + bubble radiator
+
** add reducer + ceramic break + bubble radiator
* add MIT bates magnet + Mott detector on the support table
+
** add MIT bates magnet + Mott detector on the support table
* realistic time frame for DAQ
+
** realistic time frame for DAQ
  
==ME - Second installation==
+
* Second installation
* Replace MIT magnet with Lakshmi's magnet
+
** Replace MIT magnet with Lakshmi's magnet
* Replace Mott detector with Eric's detector
+
** Replace Mott detector with Eric's detector
  
 
==Updates & Discussion==
 
==Updates & Discussion==

Revision as of 15:09, 2 February 2022

  • First installation
    • remove ~4' pipe in straight passthrough
    • add reducer + ceramic break + bubble radiator
    • add MIT bates magnet + Mott detector on the support table
    • realistic time frame for DAQ
  • Second installation
    • Replace MIT magnet with Lakshmi's magnet
    • Replace Mott detector with Eric's detector

Updates & Discussion