Difference between revisions of "UITF Notes"

From Ciswikidb
Jump to navigation Jump to search
Line 6: Line 6:
  
 
== keV beam time ==
 
== keV beam time ==
* LVQE scan at different voltages. Expect same result.
+
* LVQE scan at different voltages. Expect same result, provided different laser powers at same voltage give same result (avoid SCL).
 
* HVQE scan at different voltages. Expect different result.
 
* HVQE scan at different voltages. Expect different result.
 
** CST: Does thermal energy affect collection efficiency?
 
** CST: Does thermal energy affect collection efficiency?

Revision as of 14:39, 3 August 2022

MeV beam time

  • Measure MeV dispersion with BPMs => Done, need to analyze
  • TM beam to 703 to see RF drift (full shift)
  • Verify optics setup for HKDL
  • Repeat buncher study, booster crested, 8 MeV, multiple scans per point

keV beam time

  • LVQE scan at different voltages. Expect same result, provided different laser powers at same voltage give same result (avoid SCL).
  • HVQE scan at different voltages. Expect different result.
    • CST: Does thermal energy affect collection efficiency?
  • High current to FC2 for 12+ hours, check if drift is gone

Beam line modifications

  • Put HKDL stuff into the machine ahead of time!