Difference between revisions of "MOLLER PQB Meeting May 8, 2024"

From Ciswikidb
Jump to navigation Jump to search
Line 14: Line 14:
 
### 4-channel BPMs saturation
 
### 4-channel BPMs saturation
 
### Dumping beam harmonics right onto one of the higher order mode frequencies
 
### Dumping beam harmonics right onto one of the higher order mode frequencies
# '''Check beam power capability May 2024''': 60 A to Hall A - [https://tasklists.jlab.org/bslist/tasks/111972]
+
## '''Check beam power capability May 2024''': μ60 A to Hall A - [https://tasklists.jlab.org/bslist/tasks/111972]

Revision as of 10:00, 9 May 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

  1. Feed Forward Status: (tentatively scheduled on May 19) - media:Y.Roblin_FFBHALLA.pdf
  2. K-Long Beam Loading: (tentatively scheduled on May 19)
    1. BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [1]
    2. BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi: [2]
    3. Other issues to look for:
      1. 4-channel BPMs saturation
      2. Dumping beam harmonics right onto one of the higher order mode frequencies
    4. Check beam power capability May 2024: μ60 A to Hall A - [3]