Difference between revisions of "MOLLER PQB Meeting December 11, 2024"

From Ciswikidb
Jump to navigation Jump to search
Line 11: Line 11:
 
* '''Injector Beam Studies:'''
 
* '''Injector Beam Studies:'''
 
# Parasitic Parity DAQ checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 µA is scheduled.
 
# Parasitic Parity DAQ checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 µA is scheduled.
# MOLLER DAQ tests to 1D at 65 µA : Sunday December 15th Day and Swing shifts. At this time, MOLLER can change beam current, Helicity Board settings, etc.  
+
# MOLLER DAQ tests to 1D at 65 µA: Sunday December 15th Day and Swing shifts. At this time, MOLLER can change beam current, Helicity Board settings, etc.  
  
  

Revision as of 17:41, 11 December 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--


Agenda:


  • Injector Beam Studies:
  1. Parasitic Parity DAQ checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 µA is scheduled.
  2. MOLLER DAQ tests to 1D at 65 µA: Sunday December 15th Day and Swing shifts. At this time, MOLLER can change beam current, Helicity Board settings, etc.