Difference between revisions of "Talk:GTS meeting 4 5 16"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "* To protect the viewer crystal from beam damage: ** Ask Omar: ** To look at the GTS drive laser control chassis for DL trigger ** Is there a line-sync module? it is a logic l...")
 
Line 2: Line 2:
 
** Ask Omar:
 
** Ask Omar:
 
** To look at the GTS drive laser control chassis for DL trigger
 
** To look at the GTS drive laser control chassis for DL trigger
** Is there a line-sync module? it is a logic level to trigger things
+
** Is there a line-sync module? it is a logic level to trigger things like laser, cameras, etc.
 +
** Carlos to talk to Omar for viewer cameras and BNC cabling to monitors in the GTS control room.
  
 
* Magnet nomenclature
 
* Magnet nomenclature

Revision as of 13:50, 5 April 2016

  • To protect the viewer crystal from beam damage:
    • Ask Omar:
    • To look at the GTS drive laser control chassis for DL trigger
    • Is there a line-sync module? it is a logic level to trigger things like laser, cameras, etc.
    • Carlos to talk to Omar for viewer cameras and BNC cabling to monitors in the GTS control room.
  • Magnet nomenclature