Difference between revisions of "Talk:GTS meeting 4 5 16"
Jump to navigation
Jump to search
(Created page with "* To protect the viewer crystal from beam damage: ** Ask Omar: ** To look at the GTS drive laser control chassis for DL trigger ** Is there a line-sync module? it is a logic l...") |
|||
Line 2: | Line 2: | ||
** Ask Omar: | ** Ask Omar: | ||
** To look at the GTS drive laser control chassis for DL trigger | ** To look at the GTS drive laser control chassis for DL trigger | ||
− | ** Is there a line-sync module? it is a logic level to trigger things | + | ** Is there a line-sync module? it is a logic level to trigger things like laser, cameras, etc. |
+ | ** Carlos to talk to Omar for viewer cameras and BNC cabling to monitors in the GTS control room. | ||
* Magnet nomenclature | * Magnet nomenclature |
Revision as of 13:50, 5 April 2016
- To protect the viewer crystal from beam damage:
- Ask Omar:
- To look at the GTS drive laser control chassis for DL trigger
- Is there a line-sync module? it is a logic level to trigger things like laser, cameras, etc.
- Carlos to talk to Omar for viewer cameras and BNC cabling to monitors in the GTS control room.
- Magnet nomenclature