Difference between revisions of "GTS meeting 11 08 16"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
* Beamline Drawings:
 
* Beamline Drawings:
 
:[[file:GTS_Beamline_11-8-16_Front_View.jpg]]
 
:[[file:GTS_Beamline_11-8-16_Front_View.jpg]]
 +
 +
 
:[[media:haysg_JL0038343-MAGNETIZED_BEAM_LDRD_ASSY.pdf]]
 
:[[media:haysg_JL0038343-MAGNETIZED_BEAM_LDRD_ASSY.pdf]]
  

Revision as of 09:43, 8 November 2016

  • Beamline Drawings:
GTS Beamline 11-8-16 Front View.jpg


media:haysg_JL0038343-MAGNETIZED_BEAM_LDRD_ASSY.pdf


  • New Beamline Magnets:
  1. Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total)


  • EES support at GTS:
  1. SCAM module installation
  2. Upgrade diagnostic crossings with 3-position controls (viewer, slit, empty)
  3. Instrument Faraday Cup


  • Procurement:
  1. Two radiabeam steerers
  2. Steerers mounts
  3. What else?