Difference between revisions of "GTS meeting 8 21 17"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "* Emittance Measurements - Yan * ASTRA Simulation - Sajini: :: ASTRA simulations for the new magnetic field")
 
Line 4: Line 4:
 
* ASTRA Simulation - Sajini:
 
* ASTRA Simulation - Sajini:
 
::  ASTRA simulations for the new magnetic field
 
::  ASTRA simulations for the new magnetic field
 +
 +
 +
* New plan:
 +
# Finish emittance measurements and try a larger laser size (x3) - August 21-23
 +
# Attempt 5 mA (non-magnetized, then magnetized) - August 24 - August 31
 +
# Shutdown - September 5:
 +
## Install new YAG screen at viewer 3
 +
## New harp with 20 um tungsten wire (or fix fork on existing harp?)

Revision as of 09:00, 20 August 2017

  • Emittance Measurements - Yan


  • ASTRA Simulation - Sajini:
ASTRA simulations for the new magnetic field


  • New plan:
  1. Finish emittance measurements and try a larger laser size (x3) - August 21-23
  2. Attempt 5 mA (non-magnetized, then magnetized) - August 24 - August 31
  3. Shutdown - September 5:
    1. Install new YAG screen at viewer 3
    2. New harp with 20 um tungsten wire (or fix fork on existing harp?)