Difference between revisions of "PSS BCM meetings and documents"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
+ | PSS BCM meeting minutes 10 May, 2018 [[media: UITF PSS BCM meeting 10_May, 2018.docx]] | ||
[[Preliminary design considerations of the UITF PSS BCM system]] | [[Preliminary design considerations of the UITF PSS BCM system]] |
Revision as of 15:19, 29 May 2018
PSS BCM meeting minutes 10 May, 2018 media: UITF PSS BCM meeting 10_May, 2018.docx
Preliminary design considerations of the UITF PSS BCM system
Vashek beam loss considerations related to the design of the UITF PSS BCM system
Link to the UITF PSS BCM review of October 21, 2016, presentations from Vashek, Henry, and Trent: https://wiki.jlab.org/ciswiki/index.php/UITF_Meeting_-_October_21,_2016
Link to the Conduct of Engineering manual: https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-40063/ENG-AD-01-001%20-%20Conduct%20of%20Engineering%20Manual%20-%20rev%20A%20reverified%202015.docx
Bob May describes the process of developing a new "Credited Control", from May 19, 2016