Difference between revisions of "GTS meeting 1 07 19"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
# Remove Faraday Cup | # Remove Faraday Cup | ||
# Remove bellow upstream of dump | # Remove bellow upstream of dump | ||
+ | # Remove LDR Harp arm and replace with ion-pump | ||
# Install TE011 Cavity | # Install TE011 Cavity | ||
# Install Deflecting Cavity | # Install Deflecting Cavity | ||
Line 13: | Line 14: | ||
# All bellows at least 2.5 inch diameter | # All bellows at least 2.5 inch diameter | ||
# Both gate valves are 2.5 inch-bore and will remain on beamline | # Both gate valves are 2.5 inch-bore and will remain on beamline | ||
− | |||
Revision as of 10:51, 14 January 2019
- List of beamline hardware modifications:
- Replace YAG screen on Viewer 1
- Replace Slit on Viewer 2 with holes assembly
- Replace two ion collectors with new ones
- Replace Harp fork (Tony)
- Remove modified DP can
- Remove Faraday Cup
- Remove bellow upstream of dump
- Remove LDR Harp arm and replace with ion-pump
- Install TE011 Cavity
- Install Deflecting Cavity
- Install new 5th solenoid
- Move DP can 1 to end of beamline
- All bellows at least 2.5 inch diameter
- Both gate valves are 2.5 inch-bore and will remain on beamline
- Remove gain-switched laser from GTS to LERF
- List of software and controls changes:
- Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
- Add 5th solenoid to magnet screen
- Modification to HV and Preparation chambers:
- Upgrade anode HV bias feed-through to 5 kV
- Remove anode and clean melted spot
- Fix Transverse Manipulator
- Fix Sb boat
- Clean chamber of Sb beads