Difference between revisions of "GTS meeting 1 14 19"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "* List of beamline hardware modifications: # Replace YAG screen on Viewer 1 # Replace Slit on Viewer 2 with holes assembly # Replace two ion collectors with new ones # Replace...")
 
Line 1: Line 1:
 
* List of beamline hardware modifications:
 
* List of beamline hardware modifications:
# Replace YAG screen on Viewer 1
+
# Replace YAG screen on Viewer 1 - '''''Done'''''
# Replace Slit on Viewer 2 with holes assembly
+
# Replace Slit on Viewer 2 with holes assembly - '''''Done'''''
 
# Replace two ion collectors with new ones
 
# Replace two ion collectors with new ones
 
# Replace Harp fork (Tony)
 
# Replace Harp fork (Tony)
# Remove modified DP can
+
# Remove modified DP can - '''''Done'''''
# Remove Faraday Cup
+
# Remove Faraday Cup - '''''Done'''''
# Remove bellow upstream of dump
+
# Remove bellow upstream of dump - '''''Done'''''
 
# Remove LDR Harp arm and replace with ion-pump
 
# Remove LDR Harp arm and replace with ion-pump
 
# Install TE011 Cavity
 
# Install TE011 Cavity

Revision as of 11:52, 14 January 2019

  • List of beamline hardware modifications:
  1. Replace YAG screen on Viewer 1 - Done
  2. Replace Slit on Viewer 2 with holes assembly - Done
  3. Replace two ion collectors with new ones
  4. Replace Harp fork (Tony)
  5. Remove modified DP can - Done
  6. Remove Faraday Cup - Done
  7. Remove bellow upstream of dump - Done
  8. Remove LDR Harp arm and replace with ion-pump
  9. Install TE011 Cavity
  10. Install Deflecting Cavity
  11. Install new 5th solenoid
  12. Move DP can 1 to end of beamline
  13. All bellows at least 2.5 inch diameter
  14. Both gate valves are 2.5 inch-bore and will remain on beamline


  • Remove gain-switched laser from GTS to LERF


  • List of software and controls changes:
  1. Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
  2. Add 5th solenoid to magnet screen


  • Modification to HV and Preparation chambers:
  1. Upgrade anode HV bias feed-through to 5 kV
  2. Remove anode and clean melted spot
  3. Fix Transverse Manipulator
  4. Fix Sb boat
  5. Clean chamber of Sb pellets