(Created page with "* List of beamline hardware modifications: # Replace YAG screen on Viewer 1 # Replace Slit on Viewer 2 with holes assembly # Replace two ion collectors with new ones # Replace...") |
|||
Line 1: | Line 1: | ||
* List of beamline hardware modifications: | * List of beamline hardware modifications: | ||
− | # Replace YAG screen on Viewer 1 | + | # Replace YAG screen on Viewer 1 - '''''Done''''' |
− | # Replace Slit on Viewer 2 with holes assembly | + | # Replace Slit on Viewer 2 with holes assembly - '''''Done''''' |
# Replace two ion collectors with new ones | # Replace two ion collectors with new ones | ||
# Replace Harp fork (Tony) | # Replace Harp fork (Tony) | ||
− | # Remove modified DP can | + | # Remove modified DP can - '''''Done''''' |
− | # Remove Faraday Cup | + | # Remove Faraday Cup - '''''Done''''' |
− | # Remove bellow upstream of dump | + | # Remove bellow upstream of dump - '''''Done''''' |
# Remove LDR Harp arm and replace with ion-pump | # Remove LDR Harp arm and replace with ion-pump | ||
# Install TE011 Cavity | # Install TE011 Cavity |
Revision as of 11:52, 14 January 2019
- List of beamline hardware modifications:
- Replace YAG screen on Viewer 1 - Done
- Replace Slit on Viewer 2 with holes assembly - Done
- Replace two ion collectors with new ones
- Replace Harp fork (Tony)
- Remove modified DP can - Done
- Remove Faraday Cup - Done
- Remove bellow upstream of dump - Done
- Remove LDR Harp arm and replace with ion-pump
- Install TE011 Cavity
- Install Deflecting Cavity
- Install new 5th solenoid
- Move DP can 1 to end of beamline
- All bellows at least 2.5 inch diameter
- Both gate valves are 2.5 inch-bore and will remain on beamline
- Remove gain-switched laser from GTS to LERF
- List of software and controls changes:
- Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
- Add 5th solenoid to magnet screen
- Modification to HV and Preparation chambers:
- Upgrade anode HV bias feed-through to 5 kV
- Remove anode and clean melted spot
- Fix Transverse Manipulator
- Fix Sb boat
- Clean chamber of Sb pellets