Difference between revisions of "GTS meeting 1 14 19"
Jump to navigation
Jump to search
Line 16: | Line 16: | ||
− | * | + | * List of hardware support: |
+ | # Deflecting Cavity power supply, MO and other parts | ||
Line 30: | Line 31: | ||
# Fix Sb boat | # Fix Sb boat | ||
# Clean chamber of Sb pellets | # Clean chamber of Sb pellets | ||
+ | |||
+ | |||
+ | * Remove gain-switched laser from GTS to LERF |
Revision as of 09:33, 15 January 2019
- List of beamline hardware modifications:
- Replace YAG screen on Viewer 1 - Done
- Replace Slit on Viewer 2 with holes assembly - Done
- Replace two ion collectors with new ones
- Replace Harp fork (Tony)
- Remove modified DP can - Done
- Remove Faraday Cup - Done
- Remove bellow upstream of dump - Done
- Remove LDR Harp arm and replace with ion-pump
- Install TE011 Cavity
- Install Deflecting Cavity
- Install new 5th solenoid
- Move DP can 1 to end of beamline
- All bellows at least 2.5 inch diameter
- Both gate valves are 2.5 inch-bore and will remain on beamline
- List of hardware support:
- Deflecting Cavity power supply, MO and other parts
- List of software and controls changes:
- Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
- Add 5th solenoid to magnet screen
- Modification to HV and Preparation chambers:
- Upgrade anode HV bias feed-through to 5 kV
- Remove anode and clean melted spot
- Fix Transverse Manipulator
- Fix Sb boat
- Clean chamber of Sb pellets
- Remove gain-switched laser from GTS to LERF