* List of beamline hardware modifications:
+
= '''List of beamline hardware modifications:''' =
 
# Replace YAG screen on Viewer 1 - '''''Done'''''
 
# Replace YAG screen on Viewer 1 - '''''Done'''''
 
# Replace Slit on Viewer 2 with holes assembly - '''''Done'''''
 
# Replace Slit on Viewer 2 with holes assembly - '''''Done'''''
Line 16: Line 16:
  
  
* List of hardware support:
+
= '''List of hardware support:''' =
 
# Install Deflecting Cavity power supply, MO and other parts
 
# Install Deflecting Cavity power supply, MO and other parts
 
# Install TE011 Cavity readout cable and electronics
 
# Install TE011 Cavity readout cable and electronics
  
  
* List of software and controls changes:
+
= ''' List of software and controls changes:''' =
 
# Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
 
# Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
 
# Add 5th solenoid to magnet screen
 
# Add 5th solenoid to magnet screen
  
  
* Modification to HV and Preparation chambers:
+
= ''' Modification to HV and Preparation chambers:''' =
 
# Upgrade anode HV bias feed-through to 5 kV
 
# Upgrade anode HV bias feed-through to 5 kV
 
# Remove anode and clean melted spot
 
# Remove anode and clean melted spot
Line 34: Line 34:
  
  
* Remove gain-switched laser from GTS to LERF
+
= ''' Remove gain-switched laser from GTS to LERF''' =
  
  
* Install BNL high bunch laser
+
= ''' Install BNL high bunch laser''' =
  
  
* Install Brock's TE011 Cavity
+
= ''' Install Brock's TE011 Cavity''' =

Revision as of 09:44, 15 January 2019

List of beamline hardware modifications:

  1. Replace YAG screen on Viewer 1 - Done
  2. Replace Slit on Viewer 2 with holes assembly - Done
  3. Replace two ion collectors with new ones
  4. Replace Harp fork (Tony)
  5. Remove modified DP can - Done
  6. Remove Faraday Cup - Done
  7. Remove bellow upstream of dump - Done
  8. Remove LDR Harp arm and replace with ion-pump
  9. Install TE011 Cavity
  10. Install Deflecting Cavity
  11. Install new 5th solenoid
  12. Move DP can 1 to end of beamline
  13. All bellows at least 2.5 inch diameter
  14. Both gate valves are 2.5 inch-bore and will remain on beamline - Done


List of hardware support:

  1. Install Deflecting Cavity power supply, MO and other parts
  2. Install TE011 Cavity readout cable and electronics


List of software and controls changes:

  1. Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
  2. Add 5th solenoid to magnet screen


Modification to HV and Preparation chambers:

  1. Upgrade anode HV bias feed-through to 5 kV
  2. Remove anode and clean melted spot
  3. Fix Transverse Manipulator
  4. Fix Sb boat
  5. Clean chamber of Sb pellets


Remove gain-switched laser from GTS to LERF

Install BNL high bunch laser

Install Brock's TE011 Cavity