Difference between revisions of "GTS meeting 1 14 19"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
= '''List of beamline hardware modifications''' = | = '''List of beamline hardware modifications''' = | ||
# Replace YAG screen on Viewer 1 - '''''Done''''' | # Replace YAG screen on Viewer 1 - '''''Done''''' | ||
− | # Replace Slit on Viewer 2 with holes assembly - '''''Done''''' | + | # Replace Slit on Viewer 2 with holes assembly - '''''Done''''' |
# Replace two ion collectors with new ones | # Replace two ion collectors with new ones | ||
# Replace Harp fork (Tony) | # Replace Harp fork (Tony) |
Revision as of 09:52, 15 January 2019
List of beamline hardware modifications
- Replace YAG screen on Viewer 1 - Done
- Replace Slit on Viewer 2 with holes assembly - Done
- Replace two ion collectors with new ones
- Replace Harp fork (Tony)
- Remove modified DP can - Done
- Remove Faraday Cup - Done
- Remove bellow upstream of dump - Done
- Remove LDR Harp arm and replace with ion-pump
- Install TE011 Cavity
- Install Deflecting Cavity
- Install new 5th solenoid
- Move DP can 1 to end of beamline
- All bellows at least 2.5 inch diameter
- Both gate valves are 2.5 inch-bore and will remain on beamline - Done
List of hardware support
- Install Deflecting Cavity power supply, MO and other parts
- Install TE011 Cavity readout cable and electronics
List of software and controls changes
- Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
- Add 5th solenoid to magnet screen
Modification to HV and Preparation chambers
- Upgrade anode HV bias feed-through to 5 kV
- Remove anode and clean melted spot
- Fix Transverse Manipulator
- Fix Sb boat
- Clean chamber of Sb pellets