= '''List of completed beamline hardware modifications''' = | = '''List of completed beamline hardware modifications''' = | ||
− | # | + | # Replaced YAG screen on Viewer 1 |
− | # | + | # Replaced Slit on Viewer 2 with holes assembly |
− | # | + | # Replaced two ion collectors with new ones |
− | # | + | # Replaced Harp fork (Tony) |
− | # | + | # Removed modified DP can |
− | # | + | # Removed Faraday Cup |
− | # | + | # Removed bellow upstream of dump |
− | # | + | # Removed LDR Harp arm and replace with ion-pump |
− | # | + | # Rotated Viewer 3 to vertical |
− | # | + | # Installed TE011 Cavity |
− | # | + | # Installed Deflecting Cavity |
− | # | + | # Installed new 5th solenoid |
− | # | + | # Moved DP can 1 to end of beamline |
# All bellows at least 2.5 inch diameter | # All bellows at least 2.5 inch diameter | ||
# Both gate valves are 2.5 inch-bore | # Both gate valves are 2.5 inch-bore |
Revision as of 08:50, 11 February 2019
List of completed beamline hardware modifications
- Replaced YAG screen on Viewer 1
- Replaced Slit on Viewer 2 with holes assembly
- Replaced two ion collectors with new ones
- Replaced Harp fork (Tony)
- Removed modified DP can
- Removed Faraday Cup
- Removed bellow upstream of dump
- Removed LDR Harp arm and replace with ion-pump
- Rotated Viewer 3 to vertical
- Installed TE011 Cavity
- Installed Deflecting Cavity
- Installed new 5th solenoid
- Moved DP can 1 to end of beamline
- All bellows at least 2.5 inch diameter
- Both gate valves are 2.5 inch-bore
- S&A on Thursday February 7, 2019
List of hardware support
- Install Deflecting Cavity power supply, MO and other parts
- Install TE011 Cavity readout cable and electronics
List of software and controls changes
- Re-program SCAM to allow for 1 Hz and 50 ns macro-pulses
- Add 5th solenoid to magnet screen