Difference between revisions of "GTS meeting 2 18 19"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
* Re-install Viewer 3 camera | * Re-install Viewer 3 camera | ||
* Calibrate Viewers | * Calibrate Viewers | ||
− | * Install laser seed and pre-amp at 499 MHz | + | * Install laser seed and pre-amp at 499.000 MHz |
* Turn on QW Deflecting cavity | * Turn on QW Deflecting cavity | ||
Revision as of 08:02, 17 February 2019
No Beam Tasks
- Re-install Viewer 3 camera
- Calibrate Viewers
- Install laser seed and pre-amp at 499.000 MHz
- Turn on QW Deflecting cavity
Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate
- Check magnets
- Check viewers
- Check QW Deflecting cavity
- Check