Line 22: | Line 22: | ||
= ''' Commissioning at 125 kV with CW Beam''' = | = ''' Commissioning at 125 kV with CW Beam''' = | ||
− | * | + | * Deleiver 100 uA to dump |
* Check TE011 cavity signal | * Check TE011 cavity signal |
Revision as of 08:30, 17 February 2019
No Beam Tasks
- Re-install Viewer 3 camera
- Calibrate Viewers
- Install laser seed and pre-amp (frequency = 499.000 MHz)
- Turn on QW Deflecting cavity
Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate
- Check viewers
- Check magnets
- Check Harp
- Check QW Deflecting cavity
- Measure bunch length with QWD cavity
- Check 1-D pepper-pot
Commissioning at 125 kV with Tune Beam
- Measure beam emittance with Harp
- Measure beam emittance with 1-D pepper-pot
- Measure bunch length with QWD cavity
Commissioning at 125 kV with CW Beam
- Deleiver 100 uA to dump
- Check TE011 cavity signal