Line 2: | Line 2: | ||
* Re-install Viewer 3 camera | * Re-install Viewer 3 camera | ||
* Calibrate Viewers | * Calibrate Viewers | ||
− | * Install laser seed and pre-amp '''''(frequency = 499.000 MHz)''''' | + | * Install laser seed and pre-amp '''''(frequency = 499.000 MHz, 0dBm)''''' |
* Turn on QW Deflecting cavity | * Turn on QW Deflecting cavity | ||
Revision as of 13:05, 18 February 2019
No Beam Tasks
- Re-install Viewer 3 camera
- Calibrate Viewers
- Install laser seed and pre-amp (frequency = 499.000 MHz, 0dBm)
- Turn on QW Deflecting cavity
Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate
- Check viewers
- Check magnets
- Check Harp
- Check QW Deflecting cavity
- Measure bunch length with QWD cavity
- Check 1-D pepper-pot
Commissioning at 125 kV with Tune Beam
- Measure beam emittance with Harp
- Measure beam emittance with 1-D pepper-pot
- Measure bunch length with QWD cavity
Commissioning at 125 kV with CW Beam
- Deliver 100 uA to dump
- Check TE011 cavity signal