Difference between revisions of "GTS meeting 4 15 19"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
* List of things to do: | * List of things to do: | ||
+ | # Measure bunch length using new RF supply | ||
# Transverse beam emittance measurement with 1D pepper-pot | # Transverse beam emittance measurement with 1D pepper-pot | ||
# Commission TE011 cavity | # Commission TE011 cavity | ||
# Radiation Surveys at 1 mA | # Radiation Surveys at 1 mA | ||
# Ghost beam studies with P-Gun | # Ghost beam studies with P-Gun |
Latest revision as of 11:33, 15 April 2019
- Laser 10 W Fiber Amp will be moved to Hall A Compton on April 11, 2019 - completed
- Laser 5 W Fiber Amp will be installed on April 11, 2019 - completed, but not functional yet
- Degas deflecting cavity with RF up to 300 W - completed [1]
- List of things to do:
- Measure bunch length using new RF supply
- Transverse beam emittance measurement with 1D pepper-pot
- Commission TE011 cavity
- Radiation Surveys at 1 mA
- Ghost beam studies with P-Gun