+ | ==Unusual Circumstances== | ||
+ | There have been 3 recent incidents where fire trucks responded to alarms on the accelerator site: | ||
+ | #10A card in a 1A slot resulting in a burned up air core magnet at 0L09 | ||
+ | #Mis-wired 25A short on 100A shunt resulting in burned insulation on a ZA magnet | ||
+ | #Failed transformer winding on 28 year old klystron cathode power supply | ||
+ | |||
==What's going on around site?== | ==What's going on around site?== |
Revision as of 15:23, 4 June 2019
We'll meet in TL-2561a on June 5, 2019 @ 9:30am.
Unusual Circumstances
There have been 3 recent incidents where fire trucks responded to alarms on the accelerator site:
- 10A card in a 1A slot resulting in a burned up air core magnet at 0L09
- Mis-wired 25A short on 100A shunt resulting in burned insulation on a ZA magnet
- Failed transformer winding on 28 year old klystron cathode power supply
What's going on around site?
- CEBAF
- Steve's SAD calendar - https://accweb.acc.jlab.org/calendar/
- ...The Next SAD
- LERF
- Cryo is able to support both CEBAF (low energy) and LERF (LCLS + radio-isotope) this summer
- Can we be ready for next run in ~3 weeks (drive laser + gun) ?
- UITF
- Status of 200kV electrode
- Status of ARR
- GTS