(Created page with "*Overview: ** RF power to voltage relation- Complete ** See RF waveform "clipping"- 8/5/19 ** DC bias fix- In Progress ** Quasi-bake of gun- In Progress ** OSP- 8/6-8/7 ** Res...") |
|||
Line 1: | Line 1: | ||
*Overview: | *Overview: | ||
** RF power to voltage relation- Complete | ** RF power to voltage relation- Complete | ||
− | ** See RF waveform "clipping"- | + | ** See RF waveform "clipping"- complete (Need different optical link) |
− | ** DC bias fix- | + | ** DC bias fix- needs bench testing |
− | ** Quasi-bake of gun- | + | ** Quasi-bake of gun- complete |
** OSP- 8/6-8/7 | ** OSP- 8/6-8/7 | ||
− | ** | + | ** HV processing- In progress |
− | ** HV processing with solenoid on- | + | ** HV processing with solenoid on- sometime in the future |
− | ** RF matching- | + | ** RF matching- sometime way in the future |
+ | |||
+ | *Talking points: | ||
+ | ** HV Processing over the weekend | ||
+ | ** Krypton processing? | ||
+ | ** Double click on the dial; not around it | ||
+ | ** Optical-fiber link (need check voltage output of current unit and order) | ||
+ | ** Run without RF to have something for NAPAC (doesn't require DC Bias fix) |
Revision as of 09:20, 12 August 2019
- Overview:
- RF power to voltage relation- Complete
- See RF waveform "clipping"- complete (Need different optical link)
- DC bias fix- needs bench testing
- Quasi-bake of gun- complete
- OSP- 8/6-8/7
- HV processing- In progress
- HV processing with solenoid on- sometime in the future
- RF matching- sometime way in the future
- Talking points:
- HV Processing over the weekend
- Krypton processing?
- Double click on the dial; not around it
- Optical-fiber link (need check voltage output of current unit and order)
- Run without RF to have something for NAPAC (doesn't require DC Bias fix)