(Created page with "*Overview: ** RF power to voltage relation- Complete ** See RF waveform "clipping"- complete (Need different optical link) ** DC bias fix- needs bench testing ** Quasi-bake of...") |
|||
Line 1: | Line 1: | ||
− | * | + | *Update: |
− | ** | + | **HVPS cable wasn't grounded. It is now, but PSS Still trips. |
− | ** | + | **Issues performing sweep due to PSS configuration error |
− | ** | + | **Cathode grid possibly gone. Need to replace cathode |
− | |||
− | |||
− | |||
− | |||
− | |||
− | *Talking | + | *Talking Points: |
− | ** | + | ** Cathode/Grid Issues, risks and risk mitigation |
− | ** Krypton | + | ** HV Processing (cathode hot/cold, Krypton) |
− | ** | + | ** Mini-flange leak valve? |
− | ** | + | ** larger Ion pump? |
− | ** | + | ** extra shielding on HV Cable or move supply again? |
Revision as of 09:03, 19 August 2019
- Update:
- HVPS cable wasn't grounded. It is now, but PSS Still trips.
- Issues performing sweep due to PSS configuration error
- Cathode grid possibly gone. Need to replace cathode
- Talking Points:
- Cathode/Grid Issues, risks and risk mitigation
- HV Processing (cathode hot/cold, Krypton)
- Mini-flange leak valve?
- larger Ion pump?
- extra shielding on HV Cable or move supply again?