Difference between revisions of "GTS meeting 8 26 19"

From Ciswikidb
Jump to navigation Jump to search
 
Line 6: Line 6:
  
 
*Talking Points:
 
*Talking Points:
** Equipment damage during HV processing: Radiation gamma probe (again), LCW flowmeter chassis (again)
+
** Equipment damage during HV processing: Radiation gamma probe (again), Cathode Solenoid LCW flowmeter chassis (again)

Latest revision as of 08:59, 26 August 2019

  • Update:
    • Replaced thermionic cathode
    • Added leak valve on mini-flange
    • Started Kr processing


  • Talking Points:
    • Equipment damage during HV processing: Radiation gamma probe (again), Cathode Solenoid LCW flowmeter chassis (again)