Difference between revisions of "GTS meeting 9 16 19"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "*Update: ** Kr processing attempted - not really successful. ** 2 days under vacuum at 120kV, but with radiation increasing. ** Spare cathode is dead *Talking Points: ** Equi...")
 
Line 1: Line 1:
 
*Update:
 
*Update:
** Kr processing attempted - not really successful.
+
** Glassman control chassis broken
** 2 days under vacuum at 120kV, but with radiation increasing.
+
** Installed alternate Spellman supply
** Spare cathode is dead
 
  
*Talking Points:
+
 
** Equipment damage during HV processing: Radiation gamma probe (again), Cathode Solenoid LCW flowmeter chassis (again)
+
* To Be Fixed
** Magnetizing solenoid PS may be used in LERF for a while for isotopes.
+
** LCW chassis
 +
** Glassman chassis
  
 
*Suggested Actions:
 
*Suggested Actions:
** Open up the gun - look for damage (take care with cathode). Look for anything around the screws for the cathode electrode
+
** Test gun with spellman for trips on PSS
** Install the glassman supply as an alternative HVPS source (GTS 550 kV Glassman supply)
+
** Open up the gun - look for damage (take care with cathode)
** One final change to the grounding of the Spellman, where HVPS chassis is grounded in the vault
+
** Manufacture RF cage for gun.

Revision as of 07:04, 16 September 2019

  • Update:
    • Glassman control chassis broken
    • Installed alternate Spellman supply


  • To Be Fixed
    • LCW chassis
    • Glassman chassis
  • Suggested Actions:
    • Test gun with spellman for trips on PSS
    • Open up the gun - look for damage (take care with cathode)
    • Manufacture RF cage for gun.