Difference between revisions of "GTS meeting 9 16 19"
Jump to navigation
Jump to search
(Created page with "*Update: ** Kr processing attempted - not really successful. ** 2 days under vacuum at 120kV, but with radiation increasing. ** Spare cathode is dead *Talking Points: ** Equi...") |
|||
Line 1: | Line 1: | ||
*Update: | *Update: | ||
− | ** | + | ** Glassman control chassis broken |
− | ** | + | ** Installed alternate Spellman supply |
− | |||
− | * | + | |
− | ** | + | * To Be Fixed |
− | ** | + | ** LCW chassis |
+ | ** Glassman chassis | ||
*Suggested Actions: | *Suggested Actions: | ||
− | ** Open up the gun - look for damage (take care with cathode | + | ** Test gun with spellman for trips on PSS |
− | + | ** Open up the gun - look for damage (take care with cathode) | |
− | ** | + | ** Manufacture RF cage for gun. |
Revision as of 07:04, 16 September 2019
- Update:
- Glassman control chassis broken
- Installed alternate Spellman supply
- To Be Fixed
- LCW chassis
- Glassman chassis
- Suggested Actions:
- Test gun with spellman for trips on PSS
- Open up the gun - look for damage (take care with cathode)
- Manufacture RF cage for gun.