Difference between revisions of "PPB - Nov 18, 2020"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
;Joe | ;Joe | ||
− | *Possible CASA support topics => no feedback from Todd | + | * Status of post-doc => approved, waiting on HR |
+ | * Possible CASA support topics => no feedback from Todd | ||
* Evaluating magnet/collection topics of mutual interest w/ ILC PreLab | * Evaluating magnet/collection topics of mutual interest w/ ILC PreLab | ||
#polarized e- source (prototype gun/laser) | #polarized e- source (prototype gun/laser) | ||
Line 13: | Line 14: | ||
#e-driven capture cavity (model/sim/eng. design) | #e-driven capture cavity (model/sim/eng. design) | ||
#e-driven booster linac (eng. design) | #e-driven booster linac (eng. design) | ||
− | + | ||
==Older note meeting== | ==Older note meeting== |
Revision as of 07:06, 18 November 2020
Meeting Info
We will meet on Wed (Mexico 10am, US 12pm, France 5pm) Bluejeans: https://bluejeans.com/164307983
Updates
- Joe
- Status of post-doc => approved, waiting on HR
- Possible CASA support topics => no feedback from Todd
- Evaluating magnet/collection topics of mutual interest w/ ILC PreLab
- polarized e- source (prototype gun/laser)
- e-driven scheme electron source (eng. design)
- e-driven scheme magnetic focusing system (prototype - FC/Sol, PS, transmission line)
- e-driven capture cavity (model/sim/eng. design)
- e-driven booster linac (eng. design)
Older note meeting
- Americas Workshop on Linear Colliders (Oct 19-22)
- Jefferson Lab Accelerator Advisory Committee (Oct 20-23)
- APS Division of Nuclear Physics (Oct 29-31)