'''To-do list (Things that are broken at UITF, or could be improved upon...)''' | '''To-do list (Things that are broken at UITF, or could be improved upon...)''' | ||
− | #BPMs don’t report the same orbit in tune mode and CW | + | General: |
− | BCM outputs (we have cavities, need receivers) | + | #More concrete shielding! |
− | + | #Mu-metal | |
− | + | #Remove Rogowski coil #2 from beamline | |
− | + | #I am uncomfortable with the amount of lead stacked on the keV dump structure | |
− | + | #More UHV supplies, another set of them | |
− | + | #Boards that convert electrical to fiber and vice versa | |
− | + | #Two more electronics racks upstairs, one for polarimeter, one for PSS BCM (C channel, 6” tall, 23” long) | |
− | + | #Work table upstairs | |
− | + | #Shop vacuums in all locations! | |
− | Viewers were not always installed at useful Z locations, i.e., betatron phase advance. What is a useful location? At a beam waist. “Viewers at nodes, BPMs at anti-nodes” | + | |
− | + | Diagnostics: | |
− | Replace manual valve VMVM401 with fast valve | + | #BPMs don’t report the same orbit in tune mode and CW & BPMs report beam when there is no beam: Too much 1497 MHz rf inside the enclosure? Can the stripline BPMs look for a harmonic of 1497 MHz? Were striplines / DR receivers right choice vs older SEE antenna-style bpms? |
− | + | #BCM outputs (we have cavities, need receivers) | |
− | + | #Viewers were not always installed at useful Z locations, i.e., betatron phase advance. What is a useful location? At a beam waist. “Viewers at nodes, BPMs at anti-nodes” | |
− | Move Faraday Cup 3 to downstream viewer cross? Not adjacent to control room, that’s the point here, where radiation levels are problematic | + | #Replace manual valve VMVM401 with fast valve |
− | + | #Move Faraday Cup 3 to downstream viewer cross? Not adjacent to control room, that’s the point here, where radiation levels are problematic | |
− | + | #M703 harp doesn’t work | |
− | + | #What was the point of putting BPMs on the elevated beamline? Did we think they would see 1nA beam? I guess we just thought we would thread beam in tune mode up there…. | |
− | + | #For regions that get vented frequently, there should be flange mounted NEG pump | |
− | What was the point of putting BPMs on the elevated beamline? Did we think they would see 1nA beam? I guess we just thought we would thread beam in tune mode up there…. | + | #Cameras that can be line-synced, then we could use them to look for 60 Hz motion. |
− | Need a beam loss accounting system; MPS BCM cavity or PSS BCM but this is a much bigger project (can’t we just buy a system that Trent designed/built for SLAC, or duplicate it?) | + | #Ready for ItoVs |
− | + | #Need specialized lead-brick shielding at insertable cups | |
− | + | #Need a beam loss accounting system; MPS BCM cavity or PSS BCM but this is a much bigger project (can’t we just buy a system that Trent designed/built for SLAC, or duplicate it?) | |
− | + | #A3 should be closer to booster in order to protect the booster and define the launch | |
− | + | ||
− | + | ||
− | + | Gun/Laser (EGG): | |
− | + | #Laser power is very small. OK for bulk GaAs and keV Mott, but not enough for a program with superlattice photocathodes | |
− | + | #Move the laser under the table inside the enclosure? Eliminate the fiber... work with SSG needed to maintain all the PSS hooks. | |
− | + | #Laser power drift (temp cycle of the room AC?), but the current lock can deal with this, so not actually a problem when beam arrives at a cup or dump. Maybe a problem for Wastewater Treatment | |
− | + | #Install an insertable halfwave plate to flip the sign of the polarization | |
− | + | #Photogun and keV beamline: | |
− | + | *The photocathode lifetime at UITF is REALLY bad, the field emission at 200 kV certainly doesn’t help (is it the sole problem?). So take apart gun polish electrode, krypton process until there’s NO measureable field emission | |
− | + | *Align the gun so that the cathode AND the anode are at normal incidence relative to the beamline and trajectory | |
− | + | *Align the rest of the beamline | |
− | + | *Fix the chopper slit (Kurt Lesker says we just need a 50:1 gear box, I’ve ordered it) | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | Photogun and keV beamline: | ||
− | The photocathode lifetime at UITF is REALLY bad, the field emission at 200 kV certainly doesn’t help (is it the sole problem?). So take apart gun polish electrode, krypton process until there’s NO measureable field emission | ||
− | Align the gun so that the cathode AND the anode are at normal incidence relative to the beamline and trajectory | ||
− | Align the rest of the beamline | ||
− | Fix the chopper slit (Kurt Lesker says we just need a 50:1 gear box, I’ve ordered it) | ||
setup the chopper phases, use the chopper | setup the chopper phases, use the chopper | ||
− | at the chopper chamber, VIPK301 ion pump not energized, it is just spewing CH4 into beamline, replace it | + | *at the chopper chamber, VIPK301 ion pump not energized, it is just spewing CH4 into beamline, replace it |
− | Add load lock to depo chamber (I have cross and manipulator) | + | *Add load lock to depo chamber (I have cross and manipulator) |
− | Modify depo chamber to include new chemical sources | + | *Modify depo chamber to include new chemical sources |
− | Attempt to better align the mask | + | *Attempt to better align the mask |
− | Polish the schneedle (is it aluminum? Should be steel, no silver plating required (in fact, it’s bad), polish the interior surface of all pucks) | + | *Polish the schneedle (is it aluminum? Should be steel, no silver plating required (in fact, it’s bad), polish the interior surface of all pucks) |
− | Add the polarimeter | + | *Add the polarimeter |
− | A3 is in the wrong place, at least in terms of protecting the booster | + | *A3 is in the wrong place, at least in terms of protecting the booster |
− | Beam appears far right at ITVK203A, beam appears far left at ITVK401, maybe the alignment of the beamline will help? | + | *Beam appears far right at ITVK203A, beam appears far left at ITVK401, maybe the alignment of the beamline will help? |
− | Install vertical Wien | + | *Install vertical Wien |
− | We need a map of our network connections, what is the network layout now at UITF? Do all network connections go through the rack behind the laser room/control room. Are they all owned by Accelerator Division. I think we have a combination of IT and Accel network routers | + | #BNC spigots for triggers: pockel cell and gun mode |
− | Where are all the pc104s and how do we reset them? | + | |
− | + | Optics/CASA: | |
− | + | #The optics modeling program should tell us beam size and aspect ratio at each viewer, so we have something to work towards, quickly, empirically | |
− | + | *Electron beam optics not presently good, there is beta mismatch across the booster | |
− | + | #Institutionalize use of qsutility to set quads | |
− | + | ||
− | + | RF/LLRF: | |
+ | #Yao cavity damaged during one of the bakeouts? Pull it and check it out | ||
+ | #Buncher heater control is primitive: local heater with feedback. There is epics temperature readback, but no epics interface to the heater control. | ||
+ | #Wouldn’t it be easier to use a 200 W solid state amp to drive the 2-cell? Forward power today is only 40 W, the 2-cell is not meant to be driven hard. | ||
+ | #Complete microphonics assessment, install vibration isolation pads? | ||
+ | #Microphonics diagnostics should be available when running beam, so that when problems are encountered, we can see immediately if there’s a correlation with microphonic vibrations. At the moment, we can only assess microphonics from inside the cave, when the beam is OFF | ||
+ | #Better rf quality to 2-cell? | ||
+ | #Do the piezo tuners do anything? Why not? | ||
+ | #I think the booster should have been a low Q design to make it more reliable. I am not expert on this topic, but high Q is important for long linacs that present a large cryo burden. The booster does not pose a large cryo burden - we should have forgone Q for reliability. | ||
+ | |||
+ | DC Power: | ||
+ | #Consolidate the locations of steering magnets? Put them where they need to be | ||
+ | #Need a supply of large haimson steering magnets on the shelf (five sets should arrive soon) | ||
+ | #Polarity of magnets not all correct, and some H/V labels are incorrect | ||
+ | |||
+ | Software: | ||
+ | #Global Channel Access button doesn’t work, it would be nice to have | ||
+ | #MAC Access for Training purposes, so global doesn't have to be opened | ||
+ | #We have a Hot Check Out tool, but we don’t presently use it | ||
+ | #Some epics screens were hastily prepared, copied from CEBAF. Epics screens should be improved, streamlined | ||
+ | #UED remains a mystery to me, and from what I can tell, to most everyone else too, even people in software know little about it. Who does what? Whose responsibility is it to update UED? How does one actually do that? Maybe two people know the answers. | ||
+ | #Update the Operational Restrictions page to reflect RadCon shielding assessment, maybe I did this already? | ||
+ | |||
+ | |||
+ | SSG: | ||
+ | #Probably need a beacon or locked door to the aisle way above UITF (where we store stuff), or at least verification from RadCon that it’s ok to access this space when running beam. Or maybe it’s safe to go back there when running beam? | ||
+ | #Need a professional rapid access beacon/system at entry way to the enclosure | ||
+ | #Closed circuit cameras inside the enclosure | ||
+ | |||
+ | ACE: | ||
+ | #We need a map of our network connections, what is the network layout now at UITF? Do all network connections go through the rack behind the laser room/control room. Are they all owned by Accelerator Division. I think we have a combination of IT and Accel network routers | ||
+ | Where are all the pc104s and how do we reset them? |
Revision as of 13:19, 11 March 2021
To-do list (Things that are broken at UITF, or could be improved upon...)
General:
- More concrete shielding!
- Mu-metal
- Remove Rogowski coil #2 from beamline
- I am uncomfortable with the amount of lead stacked on the keV dump structure
- More UHV supplies, another set of them
- Boards that convert electrical to fiber and vice versa
- Two more electronics racks upstairs, one for polarimeter, one for PSS BCM (C channel, 6” tall, 23” long)
- Work table upstairs
- Shop vacuums in all locations!
Diagnostics:
- BPMs don’t report the same orbit in tune mode and CW & BPMs report beam when there is no beam: Too much 1497 MHz rf inside the enclosure? Can the stripline BPMs look for a harmonic of 1497 MHz? Were striplines / DR receivers right choice vs older SEE antenna-style bpms?
- BCM outputs (we have cavities, need receivers)
- Viewers were not always installed at useful Z locations, i.e., betatron phase advance. What is a useful location? At a beam waist. “Viewers at nodes, BPMs at anti-nodes”
- Replace manual valve VMVM401 with fast valve
- Move Faraday Cup 3 to downstream viewer cross? Not adjacent to control room, that’s the point here, where radiation levels are problematic
- M703 harp doesn’t work
- What was the point of putting BPMs on the elevated beamline? Did we think they would see 1nA beam? I guess we just thought we would thread beam in tune mode up there….
- For regions that get vented frequently, there should be flange mounted NEG pump
- Cameras that can be line-synced, then we could use them to look for 60 Hz motion.
- Ready for ItoVs
- Need specialized lead-brick shielding at insertable cups
- Need a beam loss accounting system; MPS BCM cavity or PSS BCM but this is a much bigger project (can’t we just buy a system that Trent designed/built for SLAC, or duplicate it?)
- A3 should be closer to booster in order to protect the booster and define the launch
Gun/Laser (EGG):
- Laser power is very small. OK for bulk GaAs and keV Mott, but not enough for a program with superlattice photocathodes
- Move the laser under the table inside the enclosure? Eliminate the fiber... work with SSG needed to maintain all the PSS hooks.
- Laser power drift (temp cycle of the room AC?), but the current lock can deal with this, so not actually a problem when beam arrives at a cup or dump. Maybe a problem for Wastewater Treatment
- Install an insertable halfwave plate to flip the sign of the polarization
- Photogun and keV beamline:
- The photocathode lifetime at UITF is REALLY bad, the field emission at 200 kV certainly doesn’t help (is it the sole problem?). So take apart gun polish electrode, krypton process until there’s NO measureable field emission
- Align the gun so that the cathode AND the anode are at normal incidence relative to the beamline and trajectory
- Align the rest of the beamline
- Fix the chopper slit (Kurt Lesker says we just need a 50:1 gear box, I’ve ordered it)
setup the chopper phases, use the chopper
- at the chopper chamber, VIPK301 ion pump not energized, it is just spewing CH4 into beamline, replace it
- Add load lock to depo chamber (I have cross and manipulator)
- Modify depo chamber to include new chemical sources
- Attempt to better align the mask
- Polish the schneedle (is it aluminum? Should be steel, no silver plating required (in fact, it’s bad), polish the interior surface of all pucks)
- Add the polarimeter
- A3 is in the wrong place, at least in terms of protecting the booster
- Beam appears far right at ITVK203A, beam appears far left at ITVK401, maybe the alignment of the beamline will help?
- Install vertical Wien
- BNC spigots for triggers: pockel cell and gun mode
Optics/CASA:
- The optics modeling program should tell us beam size and aspect ratio at each viewer, so we have something to work towards, quickly, empirically
- Electron beam optics not presently good, there is beta mismatch across the booster
- Institutionalize use of qsutility to set quads
RF/LLRF:
- Yao cavity damaged during one of the bakeouts? Pull it and check it out
- Buncher heater control is primitive: local heater with feedback. There is epics temperature readback, but no epics interface to the heater control.
- Wouldn’t it be easier to use a 200 W solid state amp to drive the 2-cell? Forward power today is only 40 W, the 2-cell is not meant to be driven hard.
- Complete microphonics assessment, install vibration isolation pads?
- Microphonics diagnostics should be available when running beam, so that when problems are encountered, we can see immediately if there’s a correlation with microphonic vibrations. At the moment, we can only assess microphonics from inside the cave, when the beam is OFF
- Better rf quality to 2-cell?
- Do the piezo tuners do anything? Why not?
- I think the booster should have been a low Q design to make it more reliable. I am not expert on this topic, but high Q is important for long linacs that present a large cryo burden. The booster does not pose a large cryo burden - we should have forgone Q for reliability.
DC Power:
- Consolidate the locations of steering magnets? Put them where they need to be
- Need a supply of large haimson steering magnets on the shelf (five sets should arrive soon)
- Polarity of magnets not all correct, and some H/V labels are incorrect
Software:
- Global Channel Access button doesn’t work, it would be nice to have
- MAC Access for Training purposes, so global doesn't have to be opened
- We have a Hot Check Out tool, but we don’t presently use it
- Some epics screens were hastily prepared, copied from CEBAF. Epics screens should be improved, streamlined
- UED remains a mystery to me, and from what I can tell, to most everyone else too, even people in software know little about it. Who does what? Whose responsibility is it to update UED? How does one actually do that? Maybe two people know the answers.
- Update the Operational Restrictions page to reflect RadCon shielding assessment, maybe I did this already?
SSG:
- Probably need a beacon or locked door to the aisle way above UITF (where we store stuff), or at least verification from RadCon that it’s ok to access this space when running beam. Or maybe it’s safe to go back there when running beam?
- Need a professional rapid access beacon/system at entry way to the enclosure
- Closed circuit cameras inside the enclosure
ACE:
- We need a map of our network connections, what is the network layout now at UITF? Do all network connections go through the rack behind the laser room/control room. Are they all owned by Accelerator Division. I think we have a combination of IT and Accel network routers
Where are all the pc104s and how do we reset them?