(Created page with "* Upgrade Glassman Gun PSS interlock chassis (Carlos) * Add vacuum interlock to HV supply (Scott) * Beamline - no bake of beamline: (Mamun and Bubba) ** Replace YAG screens...") |
|||
Line 17: | Line 17: | ||
** Clean/replace windows | ** Clean/replace windows | ||
** Add pucks with Moly and GaAs (Robust Photocathode) substrates | ** Add pucks with Moly and GaAs (Robust Photocathode) substrates | ||
+ | Add Oxygen | ||
+ | Remove Cs/K source | ||
+ | Add K source | ||
+ | |||
Revision as of 09:29, 18 March 2021
- Upgrade Glassman Gun PSS interlock chassis (Carlos)
- Add vacuum interlock to HV supply (Scott)
- Beamline - no bake of beamline: (Mamun and Bubba)
- Replace YAG screens on Viewers 1,2 and 3
- Replace leaky right-angle valve
- Remove Deflecting Cavity and move TE_011 Cavity in its place
- Prep Chamber: (Mamun)- Completed [1]
- Fix Transverse Manipulator
- Fix Sb boat
- Clean Sb pellets off chamber
- Clean/check Bottom Heater
- Add Cs for Robust Photocathode research
- Clean/replace windows
- Add pucks with Moly and GaAs (Robust Photocathode) substrates
Add Oxygen Remove Cs/K source Add K source
- Gun HV Chamber: (Carlos)
- Clean anode, cathode front
- Replace Anode
- Replace Pierce geometry
- Upgrade anode HV bias feed-through to 5/10 (?) kV
- Laser: (Shukui)
- Re-install 500 MHz green fiber laser
- Install new pulse laser