(Created page with "'''Open, complete, re-scheduled statuses updated 3/15/21''' ;AIPINJ * '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/22270 5D cold cathode gauge repositioning] *...") |
|||
Line 1: | Line 1: | ||
− | '''Open, complete, re-scheduled statuses updated | + | '''Open, complete, re-scheduled statuses updated 5/6/21''' |
;AIPINJ | ;AIPINJ | ||
− | |||
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/22311 Insertable Upgrade on iocin3 for viewers, faraday cup, and yag viewer] | * '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/22311 Insertable Upgrade on iocin3 for viewers, faraday cup, and yag viewer] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22151 AIPINJ: temporary 5D beam line removal] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22151 AIPINJ: temporary 5D beam line removal] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22161 Removal/Er-installation of Part of 5D line in Inj.] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22161 Removal/Er-installation of Part of 5D line in Inj.] | ||
− | |||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21370 Injector Wien Filter - system upgrade (2020 SAD)] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21370 Injector Wien Filter - system upgrade (2020 SAD)] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21164 Mat'l Handling and Installation for Phase I of Inj. Upgrade] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21164 Mat'l Handling and Installation for Phase I of Inj. Upgrade] | ||
− | |||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20270 Remove and re-install BPM's Gun to chopper] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20270 Remove and re-install BPM's Gun to chopper] | ||
− | |||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics] | ||
− | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp | + | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 "SAD 2020" Injector Harp System - interface controls upgrade] |
− | |||
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/20275 Perform Installation work for newly added Injector bpm during 2020 SAD] | * '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/20275 Perform Installation work for newly added Injector bpm during 2020 SAD] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21431 Install and Commission Wien filter Power Supplies] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21431 Install and Commission Wien filter Power Supplies] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21198 Survey support for Injector Upgrade] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21198 Survey support for Injector Upgrade] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22071 DC Power Support for Injector Upgrade] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22071 DC Power Support for Injector Upgrade] | ||
− | |||
+ | * '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22201 STAC5 A1 Aperture Epics Controls] | ||
+ | * '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1273 Testing Wien HV Controls at UITF] | ||
+ | * '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21332 Removal of PSS kicker magnet injector segment] | ||
+ | * '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21911 Gun high voltage conditioning] | ||
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW] | * '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW] | ||
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21490 IOCSE11 & IOCINSE4 BPM Controls Update] | * '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21490 IOCSE11 & IOCINSE4 BPM Controls Update] | ||
Line 29: | Line 27: | ||
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21922 Relocate Recepacles Downstairs in Injector Bldg.53] | * '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21922 Relocate Recepacles Downstairs in Injector Bldg.53] | ||
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21211 Install Lifting Plates in Ijn. Ceiling to Support 1/4 CM Swap] | * '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21211 Install Lifting Plates in Ijn. Ceiling to Support 1/4 CM Swap] | ||
+ | * '''Complete''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/22270 5D cold cathode gauge repositioning] | ||
;CIS SAD Tasks | ;CIS SAD Tasks | ||
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber] | * '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber] | ||
− | |||
* Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard | * Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard | ||
− | * | + | * Placeholder [https://logbooks.jlab.org/entry/3844689 Fix IHWP readback during SAD] |
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=20383 Injector Macropulse/Tune Mode Generator Modification] | * '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=20383 Injector Macropulse/Tune Mode Generator Modification] | ||
+ | * '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21920 CEBAF Lead Bricks : Collect, Sort, Clean, Paint, Store] | ||
;Injector Related SAD Tasks | ;Injector Related SAD Tasks | ||
− | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/ | + | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19517 Penetration Drops] |
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22130 LLRF Diagnostics and Repairs in the Linacs and Injector] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22130 LLRF Diagnostics and Repairs in the Linacs and Injector] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22100 April 2021 10 Amp System PM Maintenance] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22100 April 2021 10 Amp System PM Maintenance] | ||
Line 49: | Line 48: | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21288 429 mHz Amp & Power supply being pulled for repair] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21288 429 mHz Amp & Power supply being pulled for repair] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20271 2020 SAD Injector / North Linac 30 Hz System checks] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20271 2020 SAD Injector / North Linac 30 Hz System checks] | ||
− | |||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21330 PSS Injector Interface Chassis removal] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21330 PSS Injector Interface Chassis removal] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21145 PSS Injector Segment PLC Upgrade] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21145 PSS Injector Segment PLC Upgrade] | ||
Line 64: | Line 62: | ||
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21421 SAD 2020: P.M. of 24V Vacuum Power Supply Chassis] | * '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21421 SAD 2020: P.M. of 24V Vacuum Power Supply Chassis] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21680 VME crate upgrade to IOCIN3] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21680 VME crate upgrade to IOCIN3] | ||
− | |||
− | |||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21881 Insertable CAMAC to VME EPICS Controls upgrade Injector (iocin1->iocin1b) ] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21881 Insertable CAMAC to VME EPICS Controls upgrade Injector (iocin1->iocin1b) ] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21850 Software Controls PSS Injector and North Linac changes on iocsoftsafe2] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21850 Software Controls PSS Injector and North Linac changes on iocsoftsafe2] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21912 Perform Basic PM of 45 MeV spectrometer Power Supply] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21912 Perform Basic PM of 45 MeV spectrometer Power Supply] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=20311 2020 SAD and Beyond CAMAC / VME PM maintenance and repairs] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=20311 2020 SAD and Beyond CAMAC / VME PM maintenance and repairs] | ||
− | |||
− | |||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21103 Change transformer tap settings - oil filled transformers] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21103 Change transformer tap settings - oil filled transformers] | ||
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21991 Injector Survey Monuments install] | * '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21991 Injector Survey Monuments install] | ||
Line 79: | Line 73: | ||
* '''Complete''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21882 B53 (INJ SB) Panelboard PM] | * '''Complete''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21882 B53 (INJ SB) Panelboard PM] | ||
− | + | * '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21981 iocin1 - VME crate replacement] | |
+ | * '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21379 Study - Site Ground Loop] | ||
+ | * '''Completed''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21696 Shutdown of Panel I-BT in the Injector] | ||
+ | * '''Completed''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21653 Remove old Sonitrol system hardware from NA and SA] | ||
+ | * '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21353 Install Ion Pump HV cables and mount Junction boxes on cable trays NL and INJ] | ||
* '''Rescheduled''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21376 Injector (prebuncher, buncher and choppers)- LLRF systems upgrade to 3.0 version] | * '''Rescheduled''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21376 Injector (prebuncher, buncher and choppers)- LLRF systems upgrade to 3.0 version] |
Revision as of 20:45, 6 May 2021
Open, complete, re-scheduled statuses updated 5/6/21
- AIPINJ
- Open Insertable Upgrade on iocin3 for viewers, faraday cup, and yag viewer
- Open AIPINJ: temporary 5D beam line removal
- Open Removal/Er-installation of Part of 5D line in Inj.
- Open Injector Wien Filter - system upgrade (2020 SAD)
- Open Mat'l Handling and Installation for Phase I of Inj. Upgrade
- Open Remove and re-install BPM's Gun to chopper
- Open Pedestal Location Surveys
- Open Install Chopper SSA's
- Open Remove and calibrate current monitoring electronics
- Open "SAD 2020" Injector Harp System - interface controls upgrade
- Open Perform Installation work for newly added Injector bpm during 2020 SAD
- Open Install and Commission Wien filter Power Supplies
- Open Survey support for Injector Upgrade
- Open DC Power Support for Injector Upgrade
- Complete STAC5 A1 Aperture Epics Controls
- Complete Testing Wien HV Controls at UITF
- Complete Removal of PSS kicker magnet injector segment
- Complete Gun high voltage conditioning
- Complete Chopper SSA LCW
- Complete IOCSE11 & IOCINSE4 BPM Controls Update
- Complete Install PSS jumpers for laser work at the Injector
- Complete Relocate Recepacles Downstairs in Injector Bldg.53
- Complete Install Lifting Plates in Ijn. Ceiling to Support 1/4 CM Swap
- Complete 5D cold cathode gauge repositioning
- CIS SAD Tasks
- Open New Gun2 loading chamber
- Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
- Placeholder Fix IHWP readback during SAD
- Complete Injector Macropulse/Tune Mode Generator Modification
- Complete CEBAF Lead Bricks : Collect, Sort, Clean, Paint, Store
- Injector Related SAD Tasks
- Open Penetration Drops
- Open LLRF Diagnostics and Repairs in the Linacs and Injector
- Open April 2021 10 Amp System PM Maintenance
- Open Annual Crane Inspections Site wide May 17- May 27 2021
- Open VME FSD Master Card Commisioning
- Open 429 mHz Amp & Power supply being pulled for repair
- Open 2020 SAD Injector / North Linac 30 Hz System checks
- Open PSS Injector Interface Chassis removal
- Open PSS Injector Segment PLC Upgrade
- Open PSS CAMAC Relay cards replacement with VME versions for Injector and BSY
- Open I&C Injector Camac to Vme and camera upgrade
- Open I&C Upgrade harps to PC104
- Open I&C Upgrade existing ItoV System with ItoV VME cards
- Open I&C Accelerator network re-survey
- Open FAC Tunnel Fire Alarm and Suppression Replacement
- Open Apply labels to I&C components during 2020 SAD
- Open Neutron Detector System Installation (SAD 2020)
- Open UHV Power Supply Replacement (ISB)
- Open Trim Utility Chassis Upgrade - All CEBAF Trim Racks
- Open SAD 2020: P.M. of 24V Vacuum Power Supply Chassis
- Open VME crate upgrade to IOCIN3
- Open Insertable CAMAC to VME EPICS Controls upgrade Injector (iocin1->iocin1b)
- Open Software Controls PSS Injector and North Linac changes on iocsoftsafe2
- Open Perform Basic PM of 45 MeV spectrometer Power Supply
- Open 2020 SAD and Beyond CAMAC / VME PM maintenance and repairs
- Open Change transformer tap settings - oil filled transformers
- Open Injector Survey Monuments install
- Open Remove Old 45MeV Dump and re-Install at End of SAD
- Open Leak Repairs inside of HPA cabinets (1L02-8, 1L06-8, 1L09, and 0L04)
- Complete B53 (INJ SB) Panelboard PM
- Complete iocin1 - VME crate replacement
- Complete Study - Site Ground Loop
- Completed Shutdown of Panel I-BT in the Injector
- Completed Remove old Sonitrol system hardware from NA and SA
- Complete Install Ion Pump HV cables and mount Junction boxes on cable trays NL and INJ