Difference between revisions of "Bubble Demo ME May 9, 2014"

From Ciswikidb
Jump to navigation Jump to search
Line 3: Line 3:
 
== SUMMER Installation ==
 
== SUMMER Installation ==
 
'''DL Items'''
 
'''DL Items'''
: (Shaun/Joe) Are DL drawings signed off?
+
: (Shaun/Joe) Finalize/sign drawings
: (Tim/Joe) Identify vendor for DL?
+
: (Tim) Identify vendor for DL?  
: (Tim/Joe/Shaun) Identify vendor for DL alignment plate?
+
: (Tim/Joe/Shaun ?) Identify vendor for DL alignment plate
  
 
'''Beamline layout'''
 
'''Beamline layout'''
: (Joe/Shaun) Part list
+
: (Joe) Part list
 
:: re-use from tunnel
 
:: re-use from tunnel
 
:: on shelf
 
:: on shelf

Revision as of 15:25, 1 May 2014

We will meet Friday May 9 @ 9am in TL-2236.

SUMMER Installation

DL Items

(Shaun/Joe) Finalize/sign drawings
(Tim) Identify vendor for DL?
(Tim/Joe/Shaun ?) Identify vendor for DL alignment plate

Beamline layout

(Joe) Part list
re-use from tunnel
on shelf
buy part
design/fab part
(Shaun) Bellows arrangement
(Shaun) Modify support of "green" girder
(Shaun) Plan/schedule for drawings and fabrication
(Riad) Aluminum photon dump dimensions

Beamline components

(Joe) Are MBH corrector strengths sufficient?
(Joe M.) Is radiator cooling flange sufficient?

Bubble Chamber Alignment

(Riad/Brad/Shaun) Mounting in tunnel
(Riad/Brad/Shaun) Chamber alignment capability

FINAL installation

Identify suitable dump dipole and its dimensions