(Created page with "*ATLis Testplans (click Expand button =>) <div class="mw-collapsible mw-collapsed"> ;General / Catch-All Test Plans * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22060 22...") |
|||
Line 1: | Line 1: | ||
− | + | <div class="mw-collapsible"> | |
− | <div class="mw-collapsible | ||
;General / Catch-All Test Plans | ;General / Catch-All Test Plans | ||
Line 29: | Line 28: | ||
;Spin/Wien Test Plans | ;Spin/Wien Test Plans | ||
+ | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22441 22441 Commissioning V-Wien, H-Wien, Spin Flipper Solenoids and Autosteer Knobs] | ||
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22090 22090 Mott Hot Checkout] | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22090 22090 Mott Hot Checkout] | ||
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22091 22091 Spin Dance to Calibrate Upgraded CEBAF Injector 3D Spin Rotator] | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22091 22091 Spin Dance to Calibrate Upgraded CEBAF Injector 3D Spin Rotator] |
Revision as of 15:25, 26 May 2021
- General / Catch-All Test Plans
- 22060 Beam Commissioning AIPINJ Phase I (general ATLis)
- 21170 Injector Upgrade - Phase 1 Installation (Gun to Chopper)
- With-Beam Hardware Commissioning Test Plans
- 22441 Commissioning V-Wien, H-Wien, Spin Flipper Solenoids and Autosteer Knobs
- 22061 PSS Kicker Tests @ 130keV & 200keV
- 22080 AIPINJ: 130/200 keV HVPS vs. PCUP current monitor calibration
- 22082 AIPINJ: 130/200 keV lifetime measurements
- 22313 Compare Beam Transmission for Gun Biased at 130 and 200kV
- Beam Commissioning
- 22180 Gun to Chopper Commissioning _130keV / 200keV beam to PCup
- 22181 Early Injector Orbit Data Collection Rev. April/May 2021
- 22182 Set up beam from PCup to FC1 at 130keV
- 22183 Beam steer from FC1 to FC2
- 22184 Efficacy of Knobs chosen for spot move correction
- Optics/RF Test Plans
- 21923 Perform 130keV emittance measurements and matching as part of Injector Upgrade commissioning
- 22072 Perform 200keV emittance measurements and matching as part of Injector Upgrade commissioning
- 19784 Test multiwire emittance measurement with beam
- 22160 Measure optics at various coil fixture rotation angles for MDR1I02
- 22190 RF Elements Setup (Injector Upgrade Phase 1), Lasers phases, Prebuncher, and Choppers
- 22250 0I02 Viewer vs Harp Emittance Measurement
- Spin/Wien Test Plans
- 22441 Commissioning V-Wien, H-Wien, Spin Flipper Solenoids and Autosteer Knobs
- 22090 Mott Hot Checkout
- 22091 Spin Dance to Calibrate Upgraded CEBAF Injector 3D Spin Rotator
- 22092 Set 3D Spin Rotator: Flip-Right, Flip-Left, and Vertical Polarizarion
- 22083 AIPINJ: Test new hysteresis function for spin solenoids (MFG1I04A/B)
- 22084 AIPINJ: 130/200 keV E/B calibrations for V-Wien and H-Wien
- 22330 Measuring time of flight to chopper master slit versus Wien spin angle
- Parity Quality Beam Test Plans