Difference between revisions of "PPB - Aug 11, 2021"
Jump to navigation
Jump to search
Line 12: | Line 12: | ||
== Weekly Objective(s) == | == Weekly Objective(s) == | ||
− | * e+/e- Geant4 | + | * e+/e- Geant4 output and comparison -Sami & Mark |
+ | * connect with D. Douglas for undulator emittance control-Ryan | ||
+ | * Include quads after collimator in simulation - Mark | ||
+ | * Preliminary optimization for simulation with e-/e+ -Mark | ||
== Meeting Notes & Objectives Status == | == Meeting Notes & Objectives Status == |
Revision as of 11:10, 11 August 2021
Meeting Info
We will meet on Wed (UAS 9am, JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307
Aug 11 Agenda
- Round table updates
- Mark's presentation media:GPT-S_8112021.pptx
- schematic of layout
- fraction of e+/e- beam
- include e-
Weekly Objective(s)
- e+/e- Geant4 output and comparison -Sami & Mark
- connect with D. Douglas for undulator emittance control-Ryan
- Include quads after collimator in simulation - Mark
- Preliminary optimization for simulation with e-/e+ -Mark
Meeting Notes & Objectives Status
- Dipole straight to dump
- Target geometry curve, thickness, ect..
- beam spot size, target rotation averages the target geometry, 100-200 um huge energy
- quad after collimator
- cw long bunch issues, chopper cavity