Difference between revisions of "Facility Overview"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
'Radcon Checklists' | 'Radcon Checklists' | ||
*[https://logbooks.jlab.org/entry/3894989| RCG Checklist (8/20/21)] - Wastewater Experiment | *[https://logbooks.jlab.org/entry/3894989| RCG Checklist (8/20/21)] - Wastewater Experiment | ||
− | *[https://logbooks.jlab.org/entry/3869961| RCG | + | *[https://logbooks.jlab.org/entry/3869961| RCG Checklist (3/16/21)] |
*[https://logbooks.jlab.org/entry/3868254| RCG Checklist(3/2/21)] - HDIce run extension | *[https://logbooks.jlab.org/entry/3868254| RCG Checklist(3/2/21)] - HDIce run extension | ||
*[https://logbooks.jlab.org/entry/3861501| RCG Checklist (1/24/21)] | *[https://logbooks.jlab.org/entry/3861501| RCG Checklist (1/24/21)] |
Revision as of 17:42, 16 September 2021
Summary
Radiological Data: 'Break Point Measurements / Shielding Validation'
- Commissioning Survey to Wastewater Target (9/16/21)
- 150nA to FC3/4 @ 9.5 MeV (9/1/21)
- 10uA @ 5.16 MeV (8/13/20)
- 4 MeV Break point measurements (8/11/20)
- 2 MeV Break point measurements (8/7/20)
'Radcon Checklists'
- RCG Checklist (8/20/21) - Wastewater Experiment
- RCG Checklist (3/16/21)
- RCG Checklist(3/2/21) - HDIce run extension
- RCG Checklist (1/24/21)
- RCG Checklist (10/26/20)
- MeV run '0' checklist (7/20/20)
- 12/19/19 Commissioning Checklist