Difference between revisions of "PPB - Oct 8, 2021"
Jump to navigation
Jump to search
Line 22: | Line 22: | ||
* scheme to improve efficiency of distribution and statistics. | * scheme to improve efficiency of distribution and statistics. | ||
* 123 MeV not enough energy for two target system. | * 123 MeV not enough energy for two target system. | ||
− | * begin thinking about 10 GeV concept in the tunnel | + | * begin thinking about 10 GeV concept in the tunnel [[media:10GeV.png]] |
Revision as of 10:15, 8 October 2021
Meeting Info
We will meet on Wed (UAS 8am, JLab 10am, IJCLab 4pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307
Oct 8 Agenda
- Round table updates
- Linux GPT-s complete need to install and check before putting on the farm
- Unpolarized update- Mark
- Eric- Last 3 slides relevant to two target system media:4SHAS.pptx
- Sami- Two target simulation media:.pptx
- optimization run time 24-48 hrs
Objective(s)
- Mark: produce table for unpolarized simulation results
- Mark: 500M simulation from GEANT4 in polarized beamline
- Mark: python/Matlab GPT Plots
- Mark: Verify Linux GPT -s functions
Meeting Notes & Objectives Status
- addition of collimation in Sami's simulation.
- scheme to improve efficiency of distribution and statistics.
- 123 MeV not enough energy for two target system.
- begin thinking about 10 GeV concept in the tunnel media:10GeV.png