:: CIS has two major vacuum jobs
 
:: CIS has two major vacuum jobs
  
=== Vent VBV0I02 - VBV0I07 (Marcy, Phil)===
+
=== Vent VBV0I02 - VBV0I07 ===
* Monitor vacuum through QCM
+
* Marcy write ATLIS
* Remake leaky A2 gaskets
+
* Coordinate groups to remove/stow items
* Remove top-hat from IYG0I02 (make sure YAG is good, spare on-hand?)
+
* Coordinate with SRF before venting
* Install IHA0I02, test before pumpdown, before bakeout
+
* Dry run the entire sequence of jobs
 +
* Prep all the parts for vacuum job in tunnel
 +
* Vent through QCM
 +
* Work w/ S&A to remake A2 gasket
 +
* Rework IYG0I02, remove top-hat, align YAG screen per Dennis
 +
* Work with S&A to align YAG screen
 +
* Work with S&A to install, align IHA0I02
 +
* Check viewer and harp before and after pump down, repeatedly, carefully
 +
* Pump down and leak check
  
=== Vent Mott chamber (Marcy, Phil, Scott) ===
+
=== Vent Mott chamber ===
 +
* Joe write ATLIS
 +
* Coordinate with S&A to check gold ladder fiducials
 +
* Coordinate with Scott to disconnect diamond ladder controls
 +
* Dry run the entire sequence in tunnel
 +
* Prep all the parts before venting
 +
* Vent chamber slowly for existing gold target
 
* Remove diamond ladder
 
* Remove diamond ladder
* Install/align gold ladder
+
* Rebuild lower section of Mott (tube + window)
* Restore old controls
+
* Last step install and align gold ladder
 +
* Slow pump down, check motion controls of ladder, leak check
 
* Long pump down
 
* Long pump down
  

Revision as of 08:53, 12 January 2022

Recent Updates

Planning, planning, planning...

Major Phase 2 Beamline Components

SRF Booster
media:parts list old and new phase2 beamline.xls

FY22 SAD ATLIS Tasks

Schedule

Jason Willoughby is installing bright white task lighting w/ wall dimmer from laser hut to fc#2
Tomasz is upgrading RF
CIS has two major vacuum jobs

Vent VBV0I02 - VBV0I07

  • Marcy write ATLIS
  • Coordinate groups to remove/stow items
  • Coordinate with SRF before venting
  • Dry run the entire sequence of jobs
  • Prep all the parts for vacuum job in tunnel
  • Vent through QCM
  • Work w/ S&A to remake A2 gasket
  • Rework IYG0I02, remove top-hat, align YAG screen per Dennis
  • Work with S&A to align YAG screen
  • Work with S&A to install, align IHA0I02
  • Check viewer and harp before and after pump down, repeatedly, carefully
  • Pump down and leak check

Vent Mott chamber

  • Joe write ATLIS
  • Coordinate with S&A to check gold ladder fiducials
  • Coordinate with Scott to disconnect diamond ladder controls
  • Dry run the entire sequence in tunnel
  • Prep all the parts before venting
  • Vent chamber slowly for existing gold target
  • Remove diamond ladder
  • Rebuild lower section of Mott (tube + window)
  • Last step install and align gold ladder
  • Slow pump down, check motion controls of ladder, leak check
  • Long pump down

Beam Tests

  • (Shukui, Joe, Tomasz, Reza) Install, test and compare mode-locked vs. gain-switched fiber lasers (bleedthrough, injector setup, operation)
  • (Dennis, Ken, Alicia) Use harp to study Wien optics and test match
  • (Dennis) Evaluate optics of Lakshmi's new 15 deg DM dipole vs. existing DS dipole
  • (Max) Use BPM, Harp/lens to quantify beam deflection & Twiss vs. laser spot location
  • (Riad, Sarin) Use BPM's and Wiens to test different/new PS to suppress line noise
  • (Gabriel, Carlos) Do you need data for Wien paper?
  • (Jerry, Joe) Test 200 keV PSS kicker magnet
  • (Yan) Evaluate QCM